| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Eel Rock Rd. Storm Damage Repair 6/28/22 2pm The work to be done consists of traffic control systems, reconstructing the roadway with geogrid, co... | 06/28/2022 | ||
| Ettersburg Rd Storm Damage Repair 6/28/22 2pm The work to be done consists of traffic control systems, constructing detours, removing existing cul... | 06/28/2022 | ||
| 192 Clear Creek Mixed Use 6/15/22 5pm Mixed use building with two commercial units on lower floor and two-story duplex on top two floors. | 06/15/2022 | ||
| Amacher Boat Ramp Parking Lot 6/21/22 2pm Demolition of existing asphalt access road and parking Construct concrete launch ramp in the dry Con... | 06/06/2022 | 06/21/2022 | |
| Reser Stadium West Side Food Service Equip 6/14/22 2pm Provide and install food service equipment | 06/01/2022 | 06/14/2022 | |
| Safeway Store #397 Grants Pass 6/23/22 2pm Interior remodel and exterior improvements of an existing and operating 31,648 square foot Safeway G... | 06/23/2022 | ||
| Collector St. Maintenance & Preservation 6/13/22 2pm The work includes the furnishing of the labor, materials, and equipment for Mill & Inlay, Genera... | 06/13/2022 | ||
| Head Start Stair Replace 5/31/22 5pm Removal and disposal of the existing front wooden and concrete steps, and also the existing metal ha... | 05/31/2022 | ||
| Mountain View HS AV Project 6/9/22 2pm Supplying and installing approx. 50 classrooms with AV equipment. | 06/01/2022 | 06/09/2022 | |
| Terminal Spur Sanitary Sewer 7/5/22 2pm Construct approximately 2,570 feet of 24-inch sanitary sewer, with manholes, remove 2,095 feet of 18... | 06/01/2022 | 07/05/2022 | |
| Title | Site Walk Through | Deadline |