| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Baker Downtown Psych Svcs Remodel 6/7/22 1pm Construct individual offices within an open office space, provide associated electrical and HVAC. | 05/23/2022 | 06/07/2022 | |
| Riverland Dr. Shoulder Widening 6/16/22 11am The work consists, in general, of widening a portion of Riverland Drive (County Road No. 2H16) begin... | 06/16/2022 | ||
| SOU Roofing Project 6/9/22 3pm This project includes all labor, equipment and materials to re-roof (13) multi-family apartment buil... | 05/27/2022 | 06/09/2022 | |
| CPSD Patrick Elem & Sams Valley Parking 6/9/22 2pm The Projects include erosion control; demolition and removal of site features; general excavation; s... | 05/26/2022 | 06/09/2022 | |
| SONSA Medical Office 6/2/22 2pm A new two story medical office building with an MRI suite and future tenant space on the 1st level a... | 06/02/2022 | ||
| Restroom Remodel for Transitions Classrooms 6/14/22 2pm Restroom Remodel for Transitions Classrooms at Westmoreland School in Eugene. | 05/26/2022 | 06/14/2022 | |
| Grants Pass Armory Lockers & Cages 6/2/22 2pm Provide, assemble and install 124 Folding Guard Store More Tenant Storage Lockers and 2 sets of Sali... | 06/02/2022 | ||
| Coos Bay Armory Lift Station Repairs 6/28/22 2pm Removal of existing sewage ejection system and control panel and replace with new, removal and repla... | 06/08/2022 | 06/28/2022 | |
| Coos Bay Armory Regional Emergency Enhance 8/3/22 2pm Structural improvements and upgrades to the Coos Bay Readiness Center facility to Emergency Operatio... | 06/08/2022 | 08/03/2022 | |
| Paving of Hamby Road 6/1/22 2pm The Work will consists of, but not be limited to, the following: Install and maintain temporary tr... | 06/01/2022 | ||
| Title | Site Walk Through | Deadline |