| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Arch Svcs COCC Madras Expand 9/19/22 4pm The project consists of providing a complete range of architectural services for the first phase of ... | 09/19/2022 | ||
| Wayfinding Sign Plan Phase 1 9/16/22 4pm The City is seeking a qualified vendor to assist with final sign location placement, sign fabricatio... | 09/16/2022 | ||
| US101 MP312 Drain Cleaning Arizona Inn 9/6/22 2pm Clean 29,787 feet of horizontal drain pipe that outfalls to a 220.5 feet deep by 18.5 foot diameter ... | 08/30/2022 | 09/06/2022 | |
| Salmon Harbor Marina Dredging 9/27/22 2pm Dredging approximately (up to) 20,000 cubic yards of river sediment from two locations in Winchester... | 09/27/2022 | ||
| Examine & Assess HVAC Systems 9/27/22 3pm The County of Siskiyou is looking for a licensed well-qualified, highly experienced and professional... | 08/30/2022 | 09/27/2022 | |
| Eugene Enhanced Walking Network Rebid 11/3/22 2pm Construction of concrete sidewalk and sidewalk ramps; Asphalt pavement repairs; Permanent pavement m... | 11/03/2022 | ||
| River Road & Irving Road Upgrade 9/13/22 2pm Reconstruction of existing road; Milling of existing asphalt; Asphalt paving; Construction of concre... | 09/13/2022 | ||
| Engineer for Culvert Replace Hunsacker Ln. 9/12/22 4:30pm Professional engineering services for removal and replacement of two existing culverts located near ... | 09/12/2022 | ||
| Passenger Walkway Canopy Eugene Airport 9/22/22 2:30pm Construction of a new approximately 505′ long canopy over an existing walkway at the Eugene Ai... | 09/01/2022 | 09/22/2022 | |
| McKenzie River Intake Design Services 9/9/22 4pm This project consists of designing a new intake and raw water pump station, which utilizes the McKen... | 09/01/2022 | 09/09/2022 | |
| Title | Site Walk Through | Deadline |