| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Stearns Park Restrooms Paving 9/27/22 2pm The Paving Contractor (PC) is responsible to furnish and install final grading, compaction and pavin... | 09/16/2022 | 09/27/2022 | |
| Stearns Park Restrooms Electrical 9/27/22 2pm Electrical Contractor (EC) will provide and install a complete and satisfactorily operating electric... | 09/16/2022 | 09/27/2022 | |
| Stearns Park Restroom Earthwork 9/27/22 2pm Minor excavation and demolition, survey staking, installation of subgrade, clearing and grading, ins... | 09/16/2022 | 09/27/2022 | |
| Mastication Services 10/5/22 2:30pm The work is a component of habitat restoration, fuels reduction, and general vegetation management. ... | 09/27/2022 | 10/05/2022 | |
| Marcola SD School Bus Maintenance Bldg. 10/6/22 2pm Construct pre0fabricated metal building with concrete slab-on-grade foundation. The proposed metal b... | 09/23/2022 | 10/06/2022 | |
| Chain Link Fence & Razor Wire 9/20/22 9am Installation of 68’ of 12’ High Chain Link Fence. Install Razor Wire at the Top of the Chain Link Fe... | 09/20/2022 | ||
| Schroeder Lane Storm Drain 9/29/22 3pm Installation and Repair of a Storm Drainage System; Consisting of Approximately, 8 Manholes, 1,825 L... | 09/22/2022 | 09/29/2022 | |
| Carter Building Demo Project 10/4/22 2pm Remove the entire existing buildings as indicated on Drawings. Demolition, removal, and proper dispo... | 09/22/2022 | 10/04/2022 | |
| Roof Renovation Larkspur Community Ctr. 9/29/22 2pm The Bend Park and Recreation District will receive Proposals for a complete roof renovation of the f... | 09/21/2022 | 09/29/2022 | |
| Fern Ridge Water Tank Construction 10/11/22 10am This project will add four – 5,000 gallon tanks next to an existing 20,000 gallon concrete res... | 10/11/2022 | ||