| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| The Children’s Museum Phase II 9/12/22 2pm Phase 2 of The Children’s Museum. Improve grounds at the Carnegie Library property, located at 413 W... | 09/12/2022 | ||
| Pine Flat St. Water Main 9/29/22 2pm Work includes traffic control, erosion and sediment control, trench sheeting, shoring, and bracing, ... | 09/14/2022 | 09/29/2022 | |
| Del Norte USD Family Service Center 10/3/22 2pm Complete construction and renovation of 1200 Marshall St. office building for use as Family Service ... | 09/14/2022 | 10/03/2022 | |
| Intersection Illumination 9/13/22 2pm Supply the materials, equipment, labor and incidentals required to complete illumination improvement... | 09/13/2022 | ||
| Design Build Marina Development 10/17/22 5pm The Project consists of completing the design and constructing a new facility to replace the existin... | 09/16/2022 | 10/17/2022 | |
| Umpqua Bank Store Relocation Remodel 8/31/22 2pm Remodel of a 3,747 SF Existing Building including exterior windows, new lobby, offices, and support ... | 08/31/2022 | ||
| Cracked Beam Repair 77 N Garfield 9/15/22 4pm Repair of a significant crack in a bow truss and associated lateral bracing elements at 77 North Gar... | 09/01/2022 | 09/15/2022 | |
| US101 & OR42 Barrier Washing 9/7/22 3pm Pressure wash and paint pre-cast concrete shoulder barriers, cast in place walls and pre-cast median... | 09/07/2022 | ||
| OR99 I-5 to Scenic Ave. 9/15/22 9am 1. Install temporary traffic control devices. 2. Install underground drainage system. 3. Perform asp... | 09/15/2022 | ||
| Shady Cove 4-Plex 9/23/22 5pm Building of Five (5) separate 4-Plexes on same lot in Shady Cove, OR. All trades needed. Building pl... | 09/23/2022 | ||
| Title | Site Walk Through | Deadline |