| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Bridge Replacement McCullough Creek 3/26/21 2pm The project scope includes the design and construction of a new bridge to replace the existing bridg... | 03/26/2021 | ||
| Liquid Roads Ultra Project 3/3/21 2pm Consists of approximately 384,840 Sq Ft (42,760 Sq Yd) of surface treatment, with an engineer’s esti... | 03/03/2021 | ||
| Central Avenue Sidewalk Extension 2/24/21 2pm The project consists of constructing 700+/- linear feet of new six-foot wide sidewalk, including thr... | 02/24/2021 | ||
| Lakeview Smiles 3/1/21 5pm This is a new ground up construction project in Lakeview. The building is about 4700 square ft. | 03/01/2021 | ||
| US199 Rogue River to Applegate 3/11/21 9am The Work to be done under this Contract consists of the following: 1. Install and maintain temporary... | 03/11/2021 | ||
| Message Sign Upgrades Project 2/25/21 9am The Work to be done under this Contract consists of the following: 1. Install temporary traffic cont... | 02/25/2021 | ||
| 2021 Misc Overlays 2/24/21 10am The work under this project includes all material, labor, and equipment necessary for paving, perman... | 02/24/2021 | ||
| Hamrick Rd Signal & Construction 3/11/21 2pm There are two projects associated with this RFP. The first is a signal modification and turn lane e... | 03/11/2021 | ||
| USPS Main Post Office 2/23/21 4pm The project involves the renovation of approx. 2,703 SF of unused basement space for USPIS Domicile ... | 02/23/2021 | ||
| 2021 District 7 Azalea MIM Paving 2/18/21 3pm Cold plane pavement removal of asphalt concrete surface, furnish and place emulsified asphalt tack c... | 02/18/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.