| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Modified Hybrid Roof Replacements 1/28/21 2:30pm Remove existing roofing assembly down to the concrete deck. Inspect, clean, and prepare concrete dec... | 01/13/2021 | 01/28/2021 | |
| Corvallis High School Renovation 1/21/21 2pm All scopes of work needed with the exception of a pre-engineered metal building in the work yard. | 01/12/2021 | 01/21/2021 | |
| Replace Seismically Deficient Building 208 2/4/21 Work includes general construction, alterations, roads, walks, grading, drainage, mechanical and ele... | 01/12/2021 | 02/04/2021 | |
| CIPP Sewer Rehab Brookings 1/28/21 2pm Cleaning and CIPP lining rehabilitation of approximately 2100 lineal feet of 8” sanitary sewer pipin... | 01/28/2021 | ||
| Fred Meyer Bend 1/21/21 10am Parking lot striping, landscape refresh, demolition, concrete patching (refer to plumbing drawings),... | 01/21/2021 | ||
| Inspect & Repair Turbine Pump 1/28/21 2pm Contractor shall be responsible for transportation of the pump, column, shaft, and water box assembl... | 01/28/2021 | ||
| Bulk Bag Discharger **Cancelled** The Existing PAC system is located in the Carbon Building (See Exhibit 2) where 50-pound sacks of PA... | - | ||
| 2021 Street Preservation 2/2/21 2pm 12 lane miles of asphalt concrete pavement restoration work. The pavement restoration treatment incl... | 02/02/2021 | ||
| Professional Services 1/29/21 5pm The City of Anderson (City) is requesting Statements of Qualifications (SOQ’s) from qualified firms ... | 01/29/2021 | ||
| Tesla Motors 1/14/21 4pm Tenant improvement of a 19,028 SF building for “Tesla” auto sales, delivery and vehicle ... | 01/13/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.