| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 2021 Street Overlay Redmond 3/3/21 2pm The Project includes approximately 2,506 square yards 1 1/2″ taper grind at curb/gutter and 92... | 03/03/2021 | ||
| Broadway Ave. Sewer Replacement 2/25/21 2pm Removal and replacement of 710 feet of 10” sanitary sewer, including service laterals, prepare and p... | 02/12/2021 | 02/25/2021 | |
| Days Creek Bio Mass Boiler Relocate 2/23/21 2pm The work in general consists of providing all material, labor and equipment necessary to dismantle a... | 02/11/2021 | 02/23/2021 | |
| Pump Rebuild Darnelle & RSP 2/16/21 4pm Rebuild two immersible sewage pumps and motors to remanufactured condition. | 02/16/2021 | ||
| HVAC Install Offices in Athletic Bulding 2/11/21 1pm Installation of an HVAC system into four (4) offices in the Athletics Building located at the Oregon... | 02/11/2021 | ||
| Demo of Old Burney Library 3/4/21 11am The work in general is to demolish, remove, and dispose of the former Burney Branch of Shasta County... | 02/11/2021 | 03/04/2021 | |
| Rebuild ATON in Coos Bay 2/22/21 4pm Provide all materials, equipment, and labor to complete the Aids-To-Navigation (ATON) construction w... | 02/05/2021 | 02/22/2021 | |
| Paving of Powell Butte Highway 2/24/21 2pm The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contract... | 02/24/2021 | ||
| West Avenue Water Main 3/4/21 3pm The work contemplated consists of construction of a new 24-inch potable water transmission main from... | 02/18/2021 | 03/04/2021 | |
| Harrison & Harvard Storm Drain 2/23/21 2pm The work contemplated consists of installing approximately 60 lineal feet of 8-inch Ductile Iron (DI... | 02/23/2021 | ||
| Title | Site Walk Through | Deadline |