| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| GP Oil Stop & Car Wash 3/17/21 2pm Ground up construction of car wash and oil stop. Specs are included with the plans. | 03/17/2021 | ||
| Chemult Maintenance Shop Asbestos 3/24/21 11am Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or abat... | 03/24/2021 | ||
| Windsor Cir. 36th & 38th Pavement 3/19/21 2pm Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay on... | 03/19/2021 | ||
| Half Moon Bay Shop Flatwork 3/30/21 2pm Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prepare... | 03/12/2021 | 03/30/2021 | |
| Tank 1 & Roseburg Water System Project 5/4/21 2pm The Project consists of construction of approximately 8,300 feet of 12-inch water main, one welded s... | 03/15/2021 | 05/04/2021 | |
| Replace BMF Heaters at USCG Coos Bay 3/30/21 5pm Replace existing hydronic boiler with new energy efficient hydronic boiler in Boat Maintenance Facil... | 03/15/2021 | 03/30/2021 | |
| Stewart Parkway End Panel Repair 3/30/21 2pm Construction of replacement of the bridge end panels of the Stewart Parkway Bridge. | 03/25/2021 | ||
| Madison Elementary School Renovation 4/1/21 4pm The Project consists of major renovations to the existing Madison Elementary School Building. The ex... | 03/12/2021 | 04/01/2021 | |
| 2021 Pavement Maintenance Sisters 3/17/21 2pm Improvements generally include grind & inlay of asphalt pavement on portions of Main Avenue as w... | 03/17/2021 | ||
| COIC RFQ for A & E Services 3/19/21 4pm This project will be to design & engineer permanent bus stop pads, signage, benches, shelters &a... | 03/19/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.