| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Member Directory Member Directory | - | ||
| Highland-Glacier Sewer Repair 4/6/21 2pm The City or Redmond has three locations on Highland Ave (HWY 126 East Bound) and two locations on SW... | 04/06/2021 | ||
| North Canal Sewer Main Replace 3/30/21 2pm The City of Redmond has 480 feet of 8” asbestos concrete sewer main that needs to be removed and rep... | 03/30/2021 | ||
| WTP Site Cleanup 4/15/21 3pm The City of Grants Pass will be developing approximately 7.7 acres of industrial property located at... | 03/19/2021 | 04/15/2021 | |
| Washington St. Sewer Replace 3/25/21 2pm Construction of an 8 inch sewer main, manholes, sanitary sewer laterals and asphalt concrete paving. | 03/16/2021 | 03/25/2021 | |
| Mae Richardson Upgrades 3/18/21 2pm Remodel of 44,000+ Elementary School including: Site upgrades (expanding parking lot, install landsc... | 03/18/2021 | ||
| A & E Admin/Ops Building Upgrades 4/14/21 3pm The purpose of this document is to provide interested parties with information to enable them to pre... | 04/14/2021 | ||
| Roadway Striping Rumble Strip Install 3/30/21 10am The approximate quantities are: rumble strips (Continuous Rumble Strips), longitudinal pavement mark... | 03/30/2021 | ||
| Oil Rock, Sanding Rock Various Sites 3/23/21 10am The approximate quantities are: 1/4” – #10 sanding rock in stockpile, 2,700 Tons; 3/8” –... | 03/23/2021 | ||
| Elkton Elementary Phase II 4/1/21 3pm Construction of a 17,000 + sq ft. gym/classroom, including site preparation. The new building is a p... | 04/01/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.