| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| North Bend SD Viking Lane 5/18/21 2pm Viking Lane pavement overlay and base repair from Wildwood Drive to east side of the east entry driv... | 05/18/2021 | ||
| Lincoln St. Jefferson St. High St. 5/18/21 2pm – Temporary and permanent pedestrian and traffic control. – Temporary erosion control. &... | 05/18/2021 | ||
| Washington Ave. Bore Crossing 5/25/21 2pm Construction of a new potable water transmission main crossing the South Umpqua River and includes a... | 05/25/2021 | ||
| Sidewalk Construction Eugene Airport 5/18/21 2:30am Work includes construction of a sidewalk (approximately 3200 SF) from the Eugene Airport economy par... | 05/18/2021 | ||
| Biddle Road Paving 5/10/21 3pm Inlay Pavement preservation two inches deep. -Striping -Signal Loop Replacement | 05/10/2021 | ||
| Maslow Parking Lot Rebid 6/29/21 2pm The project includes erosion control; demolition and removal of site features; general excavation; s... | 06/14/2021 | 06/29/2021 | |
| East Gym Parking Lot Improve 5/26/21 2pm The project includes erosion control; demolition and removal of site features; general excavation; s... | 05/10/2021 | 05/26/2021 | |
| NE Negus Way & 17th Improvement 5/26/21 2pm Contract is estimated to be between $2,000,000 and $3,000,000. The Work will consists of, but not be... | 05/26/2021 | ||
| Facility Plan & Optimization Study 5/28/21 4pm The consultant shall provide adequate personnel and resources to accomplish an updated and complete ... | 05/28/2021 | ||
| Jail Video Surveillance System 5/14/21 5pm The Scope of Work is based on 4 main goals: 1. Design, plan and deploy a new Video Management System... | 05/14/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.