| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Del Norte USD Construction Trades Shop 5/6/21 2pm New construction of workshop and attached covered patio. | 04/20/2021 | 05/06/2021 | |
| Superior Court Elevator Installation 4/20/21 2pm The Project consists of the selective demolition and improvements as necessary to accommodate a new ... | 04/08/2021 | 04/20/2021 | |
| OR138 Wheel Rut Patching 4/13/21 2pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 04/13/2021 | ||
| OR126 Cline Falls Bridge Paving 4/13/21 2pm Establish a Contract for removing the existing asphalt and membrane from the existing bridge deck an... | 04/13/2021 | ||
| Elmira-Veneta Multi-Use Paths 4/29/21 4pm This project is to provide preliminary engineering and environmental studies needed to obtain NEPA a... | 04/29/2021 | ||
| Water Storage Improvement Project 5/14/21 3pm The Project contemplated consists of the following major components: • Sitework including tree remov... | 04/14/2021 | 05/14/2021 | |
| Duff WTP Relocated Entrance 4/20/21 2pm This work consists of, but is not limited to: asphalt cutting and grinding, excavation and placement... | 04/06/2021 | 04/20/2021 | |
| Fire Monitoring for Power Plant 4/20/21 2pm The successful contractor will provide a bill of materials with part numbers, which the City of Redd... | 04/08/2021 | 04/20/2021 | |
| Cross Street Water Main Replace 4/20/21 2pm Water main installation on Cross Street between N. Garfield Street and the end of Foch Street in Eug... | 04/20/2021 | ||
| Region 3 Geotechnical Drilling Rebid 5/12/21 3pm The Oregon Department of Transportation is seeking one qualified Contractor to provide Geotechnical ... | 04/13/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.