| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Spring Garden Gold Hill 4/23/21 5pm Extensive renovation of apartment complex in Gold Hill | 04/12/2021 | 04/23/2021 | |
| Spillway Concrete Crack & Joint Repair 4/15/21 2pm Construction services to repair the forebay and spillway at EWEB’s Walterville Hydroelectric P... | 04/15/2021 | ||
| RFQ Trucking Services 4/21/21 2pm The City of Medford is seeking quotes to enter as-needed contracts for dump truck services from July... | 04/21/2021 | ||
| Apron Reconstruction Gold Beach Airport 4/29/21 2pm Reconstruct new Apron pavement section • Base Bid approx. 3,000 SY • Bid Additive approx. 500 SY • S... | 04/20/2021 | 04/29/2021 | |
| Pump Station Decommission Phase 3 5/12/21 2pm Trenching and installation of gravity sewer pipeline at depths of 6 to 27 feet, sewer main pipe diam... | 04/20/2021 | 05/12/2021 | |
| Multi Site Track Resurfacing 4/22/21 2pm Briefly the work is described as: Preparing, coating and restriping synthetic track surfaces at Chur... | 04/08/2021 | 04/22/2021 | |
| Terwer Well Pump Installation 5/13/21 2pm Connect existing well to the Klamath Glen water distribution system. | 04/14/2021 | 05/13/2021 | |
| D10 Pavement Patching US97 4/19/21 2pm Filling both wheel ruts with HMAC in both travel lanes between MP 116.1 – MP117.24 and in the ... | 04/19/2021 | ||
| Vessel Disposal Pelican Marina 4/18/21 5pm The project involves removing the vessel from its current location, dismantling of the vessel in an ... | 04/18/2021 | ||
| KCR Construction Project Phase 1 4/27/21 2pm This project consists of site demolition, relocation of existing bus stop, relocation of existing ut... | 04/08/2021 | 04/27/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.