Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Roadway Striping Rumble Strip Install 3/30/21 10am
The approximate quantities are: rumble strips (Continuous Rumble Strips), longitudinal pavement m... |
03/30/2021 | ||
|
Oil Rock, Sanding Rock Various Sites 3/23/21 10am
The approximate quantities are: 1/4” – #10 sanding rock in stockpile, 2,700 Tons; 3/8” ... |
03/23/2021 | ||
|
Elkton Elementary Phase II 4/1/21 3pm
Construction of a 17,000 + sq ft. gym/classroom, including site preparation. The new building is ... |
04/01/2021 | ||
|
GP Oil Stop & Car Wash 3/17/21 2pm
Ground up construction of car wash and oil stop. Specs are included with the plans. |
03/17/2021 | ||
|
Chemult Maintenance Shop Asbestos 3/24/21 11am
Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or a... |
03/24/2021 | ||
|
Windsor Cir. 36th & 38th Pavement 3/19/21 2pm
Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay... |
03/19/2021 | ||
|
Half Moon Bay Shop Flatwork 3/30/21 2pm
Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prep... |
03/12/2021 | 03/30/2021 | |
|
Tank 1 & Roseburg Water System Project 5/4/21 2pm
The Project consists of construction of approximately 8,300 feet of 12-inch water main, one welde... |
03/15/2021 | 05/04/2021 | |
|
Replace BMF Heaters at USCG Coos Bay 3/30/21 5pm
Replace existing hydronic boiler with new energy efficient |
03/15/2021 | 03/30/2021 | |
|
Stewart Parkway End Panel Repair 3/30/21 2pm
Construction of replacement of the bridge end panels of the Stewart Parkway Bridge. |
03/25/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.