Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Engineering Svcs. Unit 9 Control Sys. 9/16/20 3pm
Replace the existing PLC controllers, HMI hardware and their associated cabinets in Unit |
08/26/2020 | 09/16/2020 | |
Elevator Maintenance Redding Airport 8/31/20 2pm
Furnish elevator maintenance service at Redding Airport per specifications, insurance requirement... |
08/24/2020 | 08/31/2020 | |
Passenger Boarding Bridge Eugene Airport 9/22/20 2:30pm
Procurement and installation of one (1) new Passenger Boarding Bridge (PBB) and one (1) fixed tun... |
08/25/2020 | 09/22/2020 | |
U of O Hayward Field Scoreboard & Suite 8/25/20 2pm
Concrete, Architectural Woodwork, Roofing, Doors, Frames and Hardware, Glazing, Drywall, Tile, Fl... |
08/14/2020 | 08/25/2020 | |
Polk St. & Chambers St. Paving 8/27/20 2:30pm
This project includes work for milling, paving and striping on Chambers St from 11th Ave to 13th ... |
08/27/2020 | ||
OR238 Applegate Bridge Timber Replace 8/26/20 3pm
1. Supply and install an engineered temporary support of the existing structure. |
08/26/2020 | ||
West Bank Path Rehab & Lighting 8/26/20 2pm
The scope of work for this contract includes: – Reconditioning existing path, includ... |
08/26/2020 | ||
Lakeview MS Security System Upgrade 8/28/20 2pm
Install, program, label, and test (including administration and calibration) Contractor furnished... |
08/28/2020 | ||
Lakeview DMV Security System Upgrade 8/28/20 2pm
Install, program, label, and test (including administration and calibration) Contractor furnished... |
08/28/2020 | ||
KFalls DMV Security System Upgrade 8/28/20 2pm
Install, program, label, and test (including administration and calibration) Contractor furnished... |
08/28/2020 | ||
Title | Site Walk Through | Deadline |