Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Elmira-Veneta Multi-Use Paths 4/29/21 4pm
This project is to provide preliminary engineering and environmental studies needed to obtain | 04/29/2021 | ||
|
Water Storage Improvement Project 5/14/21 3pm
The Project contemplated consists of the following major components: |
04/14/2021 | 05/14/2021 | |
|
Duff WTP Relocated Entrance 4/20/21 2pm
This work consists of, but is not limited to: asphalt cutting and grinding, excavation and placem... |
04/06/2021 | 04/20/2021 | |
|
Fire Monitoring for Power Plant 4/20/21 2pm
The successful contractor will provide a bill of materials with part numbers, which the City of R... |
04/08/2021 | 04/20/2021 | |
|
Cross Street Water Main Replace 4/20/21 2pm
Water main installation on Cross Street between N. Garfield Street and the end of Foch Street in ... |
04/20/2021 | ||
|
Region 3 Geotechnical Drilling Rebid 5/12/21 3pm
The Oregon Department of Transportation is seeking one qualified Contractor to provide Geotechnic... |
04/13/2021 | ||
|
Thurston Hills Trail Phase II 4/26/21 2pm
The work consists of construction of approximately 4.21 miles of new multi-use trail. Of the 4.29... |
04/12/2021 | 04/26/2021 | |
|
Tumalo-Broadway Water Line Replace 4/28/21 2:00pm
The scope of the work includes, but is not limited to, trenching & installation of approximat... |
04/14/2021 | 04/28/2021 | |
|
Virginia, Colorado Stripe & Pave 4/14/21 2pm
Removal and replacement of 577 feet of 24” storm drain, prepare and pave 1529 tons of Level 2 H... |
04/06/2021 | 04/13/2021 | |
|
Water Tank Clean & Inspect 4/5/21 2:30pm
The project has been revised to only include inspection and cleaning of the 1.6 MG tank and 200,0... |
04/05/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.