| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 2021 Chipseal Project 9/16/21 2pm The Project involves two (2) City streets, two (2) parking lots and an area at the City corporation ... | 09/09/2021 | 09/16/2021 | |
| BLM Lane Mtn. Radio Facility 9/30/21 11am Procurement, delivery and installation of a new communications tower. | 09/10/2021 | 09/30/2021 | |
| Earthwork Weed Elementary School 9/29/21 2pm Kitchen/Cafeteria building (increment 1) engineered building pad. | 09/22/2021 | 09/29/2021 | |
| COCC Chandler Chiller Replace 10/6/21 4pm Remove existing chilled water system and replace with updated specifications. | 09/15/2021 | 10/06/2021 | |
| Reser Stadium BP#4 Steel & Fire Supp 10/6/21 2pm Project is part of the new Westside Stadium, including new outdoor stadium seating areas, concourse,... | 09/14/2021 | 10/06/2021 | |
| EAC & Base Rock Production 10/19/21 10am • Produce and stockpile 3/8”- # 4 chip rock in various designated stockpile locations. • Produce and... | 10/19/2021 | ||
| Lane Co. Navigation Center Early Demo **Cancelled*** The Project consists of general construction services for the selective interior demolition of an 18... | 09/09/2021 | 09/22/2021 | |
| Substation Foundation & Conduits 9/28/21 2pm Remove existing fencing, switchgear foundation, conduits and vaults and to install equipment foundat... | 09/14/2021 | 09/28/2021 | |
| RFQ SW Oregon Regional Airport 10/15/21 2pm Submit statements of qualification for various as-needed professional services for development of bo... | 10/15/2021 | ||
| Water Quality Chemicals 10/12/21 3pm WWTP 1 is located near downtown Coos Bay at 680 Ivy Ave. The plant currently uses two chemicals. The... | 10/12/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.