Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Conduit Install S. 69th Place 10/22/20 2pm
Install underground facilities consisting of one (1) (4×4) concrete vaults, multiple two-inc... |
10/08/2020 | 10/22/2020 | |
Prineville Rails to Trails Project 10/8/20 9am
Work includes grading, paving, curb ramps, signing and signal. |
10/08/2020 | ||
CM/GC Community Hall Slope 10/8/20 2pm
OSU is seeking proposals from qualified CM/GC firms to provide pre-construction services, constru... |
09/24/2020 | 10/08/2020 | |
Architectural Design Boivin Hall 10/13/20 1pm
The Oregon Institute of Technology (“Oregon Tech”) is seeking proposals to select a contracto... |
10/13/2020 | ||
Phoenix High School BP3 Project 10/15/20 2pm
Final Cleaning, Selective Demolition, Strengthening of Cast-In-Place Concrete, |
09/25/2020 | 10/15/2020 | |
Umpqua Dunes Staging Area Expansion 10/7/20 2pm
Slurry seal existing trailhead, pave existing gravel |
09/25/2020 | 10/07/2020 | |
OR126 Florence Eugene Shoulder Widen 10/8/20 9am
Project includes roadway construction, traffic control, erosion control, signs, and pavement mark... |
10/08/2020 | ||
OR234 Gold Hill Sams Valley Intersection Project 10/8/20 9am
Project includes roadway construction, traffic control, erosion control, signs, signals, illumina... |
10/08/2020 | ||
Northbound Port of Entry Paving Project 10/7/20 2pm
The purpose of this ITB is to establish a Contract for furnishing materials, equipment, labor, an... |
10/07/2020 | ||
Newmark Bank Stabilization 10/6/20 2pm
Excavate west end of Newmark Ave., install riprap, and install 60 feet of cured-in-place pipe lin... |
09/24/2020 | 10/06/2020 | |
Title | Site Walk Through | Deadline |