| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Building 127 Kingsley Field 9/23/21 11am Building 127 addition proposes a Pre-Engineered Metal Building (PEMB) to accommodate a 4,750SF facil... | 09/23/2021 | ||
| Chemical Injection Sprayer 10/14/21 2pm Purchase of one (1) chemical injection sprayer. | 10/14/2021 | ||
| Pithvuyram Center Remodel 9/27/21 4pm THE EXISTING KARUK “OLD GYM”, WHICH IS 3,704 SQUARE FEET, WILL BE RENOVATED INTO A COMMU... | 09/27/2021 | ||
| RCC Ceramics Building Redwood Campus 10/11/21 2pm Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceramics... | 09/28/2021 | 10/11/2021 | |
| California Alley Utility Improve 10/14/21 3pm Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street. P... | 10/14/2021 | ||
| Design Build Winston Dillard SD Offices 11/4/21 2pm The building must have twelve (12) offices as detailed: 1. Superintendent office with room for a con... | 11/04/2021 | ||
| Evergreen Family Medicine Office 10/7/21 4pm Adroit Construction Company is seeking subcontractor bids for work including but not limited to: Fin... | 10/07/2021 | ||
| Peoples Irrigation Pipe Install 10/5/21 2pm Mobilize, perform selective demolition, install a furnished approximate 1,893 LF of 48-inch diameter... | 09/23/2021 | 10/05/2021 | |
| Water Quality Improvements Project 10/19/21 2pm Construct a new chemical storage and dosing building at the Robert A. Duff Water Treatment Plant (Du... | 10/19/2021 | ||
| Solid Waste Beaver Hill Fence Project 10/5/21 2pm Install new 7-foot chain link fence including all hardware, post, rails, and braces with new three s... | 09/16/2021 | 10/05/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.