Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Superior Court Elevator Installation 4/20/21 2pm
The Project consists of the selective demolition and improvements as necessary to accommodate a n... |
04/08/2021 | 04/20/2021 | |
|
OR138 Wheel Rut Patching 4/13/21 2pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
04/13/2021 | ||
|
OR126 Cline Falls Bridge Paving 4/13/21 2pm
Establish a Contract for removing the existing asphalt and membrane from the existing bridge deck... |
04/13/2021 | ||
|
Elmira-Veneta Multi-Use Paths 4/29/21 4pm
This project is to provide preliminary engineering and environmental studies needed to obtain | 04/29/2021 | ||
|
Water Storage Improvement Project 5/14/21 3pm
The Project contemplated consists of the following major components: |
04/14/2021 | 05/14/2021 | |
|
Duff WTP Relocated Entrance 4/20/21 2pm
This work consists of, but is not limited to: asphalt cutting and grinding, excavation and placem... |
04/06/2021 | 04/20/2021 | |
|
Fire Monitoring for Power Plant 4/20/21 2pm
The successful contractor will provide a bill of materials with part numbers, which the City of R... |
04/08/2021 | 04/20/2021 | |
|
Cross Street Water Main Replace 4/20/21 2pm
Water main installation on Cross Street between N. Garfield Street and the end of Foch Street in ... |
04/20/2021 | ||
|
Region 3 Geotechnical Drilling Rebid 5/12/21 3pm
The Oregon Department of Transportation is seeking one qualified Contractor to provide Geotechnic... |
04/13/2021 | ||
|
Thurston Hills Trail Phase II 4/26/21 2pm
The work consists of construction of approximately 4.21 miles of new multi-use trail. Of the 4.29... |
04/12/2021 | 04/26/2021 | |
| Title | Site Walk Through | Deadline |