| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Noble Creek Tidelands Project 10/15/21 4:30pm
Design and Engineering of the Noble Creek Tidelands Restoration project, which includes features ... |
09/29/2021 | 10/15/2021 | |
|
State Spec Base & Sanding Rock 10/13/21 1pm
Purchase of 3/4 Oregon State Spec Base Rock & #4 – #10 Sanding Rock to the City of Bend... |
10/13/2021 | ||
|
Cheldelin Middle School Renovation 10/7/21 2pm
The project includes seismic, mechanical, and electrical upgrades, as well as renovations to exis... |
10/07/2021 | ||
|
Building 127 Kingsley Field 9/23/21 11am
Building 127 addition proposes a Pre-Engineered Metal Building (PEMB) to |
09/23/2021 | ||
|
Chemical Injection Sprayer 10/14/21 2pm
Purchase of one (1) chemical injection sprayer. |
10/14/2021 | ||
|
Pithvuyram Center Remodel 9/27/21 4pm
THE EXISTING KARUK “OLD GYM”, WHICH IS 3,704 SQUARE FEET, |
09/27/2021 | ||
|
RCC Ceramics Building Redwood Campus 10/11/21 2pm
Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceram... |
09/28/2021 | 10/11/2021 | |
|
California Alley Utility Improve 10/14/21 3pm
Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street... |
10/14/2021 | ||
|
Design Build Winston Dillard SD Offices 11/4/21 2pm
The building must have twelve (12) offices as detailed: |
11/04/2021 | ||
|
Evergreen Family Medicine Office 10/7/21 4pm
Adroit Construction Company is seeking subcontractor bids for work including but |
10/07/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.