Metal Roof Installation 10/7/20 4pm
Installation of insulation and metal roof with a 4/12 pitch on a 40x60x24 metal building. All m... |
10/07/2020 | ||
Leachate Pond & Floating Cover Replace 12/16/20 10am
Remove and dispose of existing floating cover system into onsite landfill; remove estimated 500,0... |
12/16/2020 | ||
South Hills 4th Level Reservoir 11/12/20 2pm
Construction of a new South Hills 4th Level Reservoir, a 0.46-million-gallon (MG) gro... |
10/07/2020 | 11/12/2020 | |
ZIRC Annex Abatement & Demolition 10/13/20 2pm
Asbestos Abatement and demolition of a 20′ x 50′ metal building located on the North ... |
10/13/2020 | ||
36th Avenue Water Main Replacement 10/20/20 2pm
Water main replacement on 36th Ave Crest Dr to Monroe St. in Eugene OR. |
10/20/2020 | ||
Weekend Beer Company 10/13/20 2pm
New construction of pre-engineered metal building with design/build MEP systems. Work also includ... |
10/13/2020 | ||
Huestis Hall Deferred Maintenance 10/16/20 2pm
Preconstruction and Construction services for the Huestis Hall Deferred Maintenance Project encom... |
10/06/2020 | 10/16/2020 | |
Pruner Industrial Way Traffic Control Project 10/30/20 2pm
The project scope includes two phases. Phase 1 consists of engineering design of the chosen tra... |
10/30/2020 | ||
ESB Project 2020 D7 North Douglas Curbing 10/13/20 3pm
Removing existing curbing and constructing new concrete drainage curbing at various locations alo... |
10/13/2020 | ||
Family Mart Shell N Medford 4/9/21 4pm
Current construction of new Shell gas station and convenience store at 70 Rossanley in Medford. R... |
04/09/2021 | ||