Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Lost River Weed Abatement 6/10/21 5pm
This Bureau of Reclamation, Klamath Basin Area Office (Reclamation) requires noxious weed abateme... |
06/10/2021 | ||
|
North Umpqua Radio Tower 6/16/21 4pm
This project will build a pad for an 80-ft Rohn Tower (Government furnished), connect utilities ... |
06/16/2021 | ||
|
Graham Field Offices Residing Project 6/9/21 2pm
The Project consists of exterior building envelope repairs. The Work includes selective demolitio... |
06/02/2021 | 06/09/2021 | |
|
2021 Drywell Elimination Program 6/10/21 2:30pm
The scope of work for this contract includes: – Cleaning existing stormwater system<... |
06/10/2021 | ||
|
Amazon Prarie Mitigation Bank 6/15/21 1pm
The scope of work for this contract includes: – Preservation and protection of exist... |
06/15/2021 | ||
|
COID Pilot Butte Small Diameter Pipe 7/1/21 2:00pm
Piping currently open irrigations canals in multiple segments. This includes piping of the mainli... |
07/01/2021 | ||
|
COID Pilot Butte Canal Precast Concrete 7/1/21 2:00pm
Piping currently open irrigations canals in multiple segments. This includes piping of the mainli... |
07/01/2021 | ||
|
E 40th Ave Storage Tank Tree Remove 6/10/21 2pm
The project will require the removal and disposal of approximately 265 trees, installation of 1,7... |
06/02/2021 | 06/10/2021 | |
|
Platt Ave Curb Gutter Paving 6/15/21 11am
Curb and Gutter, Paving, Grading |
06/15/2021 | ||
|
ERD Parcel 3BC MEP Design Build 6/14/21 2pm
The project is four-story apartment building that is “C” shaped in plan with an area of appro... |
06/14/2021 | ||
| Title | Site Walk Through | Deadline |