Title | Site Walk Through | Deadline | |
---|---|---|---|
Library Chiller 2/24/21 4pm
Central Oregon Community College (COCC) requests proposals from qualified vendors for the College... |
02/03/2021 | 02/24/2021 | |
Nonpareil WTP Improvements 2/24/21 2pm
a. Intake building improvements, including new air compressor, new actuated valve, electrical imp... |
02/09/2021 | 02/24/2021 | |
Trinity Way Waterline Extension 2/16/21 2pm
Construction of an 8-inch water main, a 1” copper water service, trenching and patching, and 30... |
02/16/2021 | ||
South Barney Sewer Project 2/10/21 4pm
The Project consists of the construction of approximately 1,575 feet of 8-inch sewer main, 7 manh... |
02/10/2021 | ||
Pedestrian Crossing Improvements 2/16/21 2:00pm
Mobilization, traffic control, removing existing sidewalk and installing bulb-outs, curb ramps, n... |
02/16/2021 | ||
Remove & Replace Rooftop Griffin Creek 2/17/21 2pm
Establish a firm fixed price contract with one qualified source to perform removal, disposal and ... |
01/29/2021 | 02/17/2021 | |
Gangnes Dr. Sewer Realignment 2/9/21 2:15pm
The construction of 1,505 feet of 8 inch sanitary sewer pipe along with associated service latera... |
02/09/2021 | ||
Middletown PRV Improvements 2/18/21 4pm
This project will include the removal of an existing check valve and the construction of a new pr... |
02/18/2021 | ||
Installation of ADA Operators 2/8/21 3pm
Supply and install all required components needed to add (7) ADA Operators and (14) Hands Free AD... |
01/27/2021 | 02/08/2021 | |
Emergency Power Generation Various 3/3/21 3pm
The work consists of the demolition and replacement of multiple generation units throughout the u... |
02/04/2021 | 03/03/2021 | |