Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Rimrock Pump Stations Improvement 5/27/21 2pm
Construction of 940 LF of 8-inch water main & reconnection of existing water services, constr... |
05/13/2021 | 05/27/2021 | |
|
BPA K & T Analog Retirement 6/10/21 12pm
Contractor shall remove buildings, foundations and equipment from Bonneville Power Administration... |
06/10/2021 | ||
|
Shasta & Alta Vista All Way Stop 5/5/21 10am
South Shasta Ave at Alta Vista Rd – All Way Stop, City of Eagle Point. Project includes Stripin... |
05/05/2021 | ||
|
Thoroughman Barn 5/21/21 5pm
Bids needed for metal roof & flashing. Project began 4/28. Roof installation needed approxima... |
05/21/2021 | ||
|
Install Solar Panels Equip Enclosures 6/11/21 5pm
Installation of site solar panels and peripheral equipment enclosures. Services will include prep... |
06/11/2021 | ||
|
Fabrication for Peripheral Enclosures 5/28/21 5pm
Fabrication of aluminum enclosures to house seismic equipment and its ancillary systems, includin... |
05/28/2021 | ||
|
City Fueling Station 5/27/21 2pm
This project consists of constructing a new City owned fuel facility at the corner of Wood and L ... |
05/13/2021 | 05/27/2021 | |
|
4th St. Paving & Restoration 5/5/21 2pm
Includes excavation, curb & gutter remove/replace, asphalt & tack coat. |
05/05/2021 | ||
|
Padmount Switch 25kv 5/6/21 2pm
This specification covers three phase dead-front, 25 kV air insulated padmount |
05/06/2021 | ||
|
Electrical Deficiencies Roseburg VA 5/26/21 2pm
Contract is to correct electrical deficiencies campus wide at the Roseburg VAMC. P... |
05/26/2021 | ||
| Title | Site Walk Through | Deadline |