Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Fire Monitoring for Power Plant 4/20/21 2pm
The successful contractor will provide a bill of materials with part numbers, which the City of R... |
04/08/2021 | 04/20/2021 | |
Cross Street Water Main Replace 4/20/21 2pm
Water main installation on Cross Street between N. Garfield Street and the end of Foch Street in ... |
04/20/2021 | ||
Region 3 Geotechnical Drilling Rebid 5/12/21 3pm
The Oregon Department of Transportation is seeking one qualified Contractor to provide Geotechnic... |
04/13/2021 | ||
Thurston Hills Trail Phase II 4/26/21 2pm
The work consists of construction of approximately 4.21 miles of new multi-use trail. Of the 4.29... |
04/12/2021 | 04/26/2021 | |
Tumalo-Broadway Water Line Replace 4/28/21 2:00pm
The scope of the work includes, but is not limited to, trenching & installation of approximat... |
04/14/2021 | 04/28/2021 | |
Virginia, Colorado Stripe & Pave 4/14/21 2pm
Removal and replacement of 577 feet of 24” storm drain, prepare and pave 1529 tons of Level 2 H... |
04/06/2021 | 04/13/2021 | |
Water Tank Clean & Inspect 4/5/21 2:30pm
The project has been revised to only include inspection and cleaning of the 1.6 MG tank and 200,0... |
04/05/2021 | ||
E 19th Ave & Fairmont Paving 4/20/21 2pm
The scope of work for this contract includes: Construction of Concrete Walk, Curb and Gutter, Asp... |
04/20/2021 | ||
I-5 Northbround Fence MP 11 & 14 4/8/21 3pm
Replacement of 6900′ +/- of existing fence with new Type 2 Field Fence located on Interstat... |
04/08/2021 | ||
Caldwell Park Skatepark Addition 4/27/21 3pm
This project includes an approximately 17,155 square foot, poured-in-place, concrete skatepark, a... |
04/27/2021 | ||
Title | Site Walk Through | Deadline |