Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Sidewalk Construction Eugene Airport 5/18/21 2:30am
Work includes construction of a sidewalk (approximately 3200 SF) from the Eugene Airport economy ... |
05/18/2021 | ||
|
Biddle Road Paving 5/10/21 3pm
Inlay Pavement preservation two inches deep. |
05/10/2021 | ||
|
Maslow Parking Lot Rebid 6/29/21 2pm
The project includes erosion control; demolition and removal of site features; general excavation... |
06/14/2021 | 06/29/2021 | |
|
East Gym Parking Lot Improve 5/26/21 2pm
The project includes erosion control; demolition and removal of site features; general excavation... |
05/10/2021 | 05/26/2021 | |
|
NE Negus Way & 17th Improvement 5/26/21 2pm
Contract is estimated to be between $2,000,000 and $3,000,000. The Work will consists of, but not... |
05/26/2021 | ||
|
Facility Plan & Optimization Study 5/28/21 4pm
The consultant shall provide adequate personnel and resources to accomplish an updated and comple... |
05/28/2021 | ||
|
Jail Video Surveillance System 5/14/21 5pm
The Scope of Work is based on 4 main goals: |
05/14/2021 | ||
|
Redwood Highway Waterline Replacement 5/25/21 2pm
Furnishing all labor, equipment and materials necessary to replace the existing 4‐inch Water Ma... |
05/14/2021 | 05/25/2021 | |
|
Wastewater Rehab Harlow Manholes 5/13/21 2pm
This project is for the elimination of groundwater infiltration and inflow into the public collec... |
05/13/2021 | ||
|
Taxiway A Reconstruction 5/27/21 10am
The scope of work being considered is: 1. Reconstruction of Taxiway A (Approximately 12,500 SY); ... |
05/13/2021 | 05/27/2021 | |
| Title | Site Walk Through | Deadline |