| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Interstate 5 MP28-27 Paving 2/2/22 2pm Asphalt Pavement Grind Inlay Preservation on Interstate 5 from MP 28 to MP 27 in Jackson County, Ore... | 02/02/2022 | ||
| I-5 MP36-35 Paving 2/2/22 3pm Striping & Grind inlay pavement preservation | 02/02/2022 | ||
| Conduit Install Dir. Bore Otto St. 1/28/22 2pm Install underground facilities consisting of one (1) three-inch (3”) conduit for new underground ele... | 01/24/2022 | 01/28/2022 | |
| BLSD Infrared Heating Replacement 2/8/22 2pm Demo existing and install new infrared heating systems in Bend – La Pine Schools’ Transportation Sho... | 01/19/2022 | 02/08/2022 | |
| Ponderosa ES Drainage Improvements 2/3/22 2pm Installation of drainage improvements including, but not limited to three (3) drywells and sedimenta... | 02/03/2022 | ||
| Supply & Deliver Asphalt Oil for Chip Seal 2/2/22 2pm The Work will consist of, but not be limited to, furnishing and delivery of asphalt materials as fol... | 02/02/2022 | ||
| Winchester Bay Commercial Bldg. 2/22/22 2pm The Project consists of the construction of an approximately 4000 square foot building, along with a... | 02/22/2022 | ||
| Board of Supervisors AV System Upgrade 2/3/22 3pm The system will include voice lift, video presentation and USB connection for Zoom and/or other PC b... | 02/03/2022 | ||
| City Hall EV Charging Station 2/24/22 2pm • Install new panel and necessary equipment • Install new electric vehicle charger purchased by the ... | 02/24/2022 | ||
| Washington St. PS Pump Upgrade 2/17/22 2pm The Project is composed of replacement of four (4) large sewer pumps, replacement of two (2) small s... | 01/25/2022 | 02/17/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.