Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
D10 Pavement Patching US97 4/19/21 2pm
Filling both wheel ruts with HMAC in both travel lanes between MP 116.1 – MP117.24 and in t... |
04/19/2021 | ||
Vessel Disposal Pelican Marina 4/18/21 5pm
The project involves removing the vessel from its current location, dismantling of the vessel in ... |
04/18/2021 | ||
KCR Construction Project Phase 1 4/27/21 2pm
This project consists of site demolition, relocation of existing bus stop, relocation of existing... |
04/08/2021 | 04/27/2021 | |
Del Norte USD Construction Trades Shop 5/6/21 2pm
New construction of workshop and attached covered patio. |
04/20/2021 | 05/06/2021 | |
Superior Court Elevator Installation 4/20/21 2pm
The Project consists of the selective demolition and improvements as necessary to accommodate a n... |
04/08/2021 | 04/20/2021 | |
OR138 Wheel Rut Patching 4/13/21 2pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
04/13/2021 | ||
OR126 Cline Falls Bridge Paving 4/13/21 2pm
Establish a Contract for removing the existing asphalt and membrane from the existing bridge deck... |
04/13/2021 | ||
Elmira-Veneta Multi-Use Paths 4/29/21 4pm
This project is to provide preliminary engineering and environmental studies needed to obtain | 04/29/2021 | ||
Water Storage Improvement Project 5/14/21 3pm
The Project contemplated consists of the following major components: |
04/14/2021 | 05/14/2021 | |
Duff WTP Relocated Entrance 4/20/21 2pm
This work consists of, but is not limited to: asphalt cutting and grinding, excavation and placem... |
04/06/2021 | 04/20/2021 | |
Title | Site Walk Through | Deadline |