Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Bridge Preventative Maintenance 7/20/21 2pm
The work to be done on BPMP 5904(140) consists of traffic control, cleaning bridge expansion join... |
07/20/2021 | ||
|
Structural Add Ward Rhoden Stadium 7/15/21 2pm
Upgrades to stadium bleacher seating. |
06/24/2021 | 07/15/2021 | |
|
Oregon War Heroes Memorial Landscape 8/5/21 2pm
This project consists of landscaping, irrigation, and electrical lighting installation. This is a... |
08/05/2021 | ||
|
The Village School HVAC Gym & Office 6/28/21 6pm
The kitchen and cafeteria currently are connected to a lega... |
06/28/2021 | ||
|
The Village School HVAC Kitchen & Cafeteria 6/28/21 6pm
The kitchen and cafeteria currently are connected to a lega... |
06/28/2021 | ||
|
The Ewing Building 7/22/21 2pm
The project is the new construction of a 7,524 SF pre-engineered metal building (PEMB) structure ... |
07/22/2021 | ||
|
Soil Stabilization Mercer Lake Rd. 6/29/21 1pm
The approximate length of roadway to have the adjacent slopes stabilized by preapproved methods o... |
06/29/2021 | ||
|
Shasta Middle School Classroom Reno 6/29/21 3pm
2,800 SF Tenant Improvement (TI) of the Shasta Middle School Life Skills Classroom, including int... |
06/18/2021 | 06/29/2021 | |
|
Tulelake Parking Lot Gravel 6/25/21 5pm
Supply and Deliver 1,400 tons of ¾ inch minus commercial gravel to the Lower Klamath Maintenance... |
06/25/2021 | ||
|
South Gate Bridge Project 7/22/21 1pm
Build and install a 28 foot long by 16 foot wide concrete bridge with precast, pre-stressed voide... |
07/22/2021 | ||
| Title | Site Walk Through | Deadline |