| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| City Hall EV Charging Station 2/24/22 2pm • Install new panel and necessary equipment • Install new electric vehicle charger purchased by the ... | 02/24/2022 | ||
| Washington St. PS Pump Upgrade 2/17/22 2pm The Project is composed of replacement of four (4) large sewer pumps, replacement of two (2) small s... | 01/25/2022 | 02/17/2022 | |
| Highland – Glacier Sewer Repair 2/9/22 2pm Repair sewer main displacements in 3 locations on Highland and 2 locations on Glacier. | 02/09/2022 | ||
| North Canal Sewer Main 2/9/22 2pm Replacement of asbestos concrete sewer mainline on North Canal Blvd between Maple and Larch Avenues. | 02/09/2022 | ||
| N Pine St. Sidewalk & Path Improve 2/15/22 2pm Construction of 8-foot wide concrete sidewalk & 8-foot asphalt paths including ADA improvements,... | 01/20/2022 | 02/15/2022 | |
| Roof Maintenance Services 2/8/22 3pm The City of Redding wishes to establish a contract with a qualified contractor to furnish on-call ro... | 02/08/2022 | ||
| 2022 Street Preservation 2/16/22 2pm 26 lane miles of asphalt concrete pavement restoration work. The pavement restoration treatments inc... | 01/26/2022 | 02/16/2022 | |
| Removal of Black Locust Trees 1/25/22 2pm Removal of Black Locust trees in the Tower House Historic District at Whiskeytown National Recreatio... | 01/25/2022 | ||
| Landscape Maintenance Svcs. 1/21/22 3pm The City of Sutherlin is seeking a qualified licensed and bonded professional landscape maintenance ... | 01/21/2022 | ||
| Design/Build Muni Pool Replace 2/2/22 2pm A design-build contract intended to replace the existing pool recirculation, filtering and pool heat... | 02/02/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.