Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Fuel Pad Parking Cover 9/21/21 2pm
The work in general consists of providing all material, labor and equipment necessary to complete... |
09/07/2021 | 09/21/2021 | |
|
Parking Structure Security Upgrade Rebid 9/14/21 2pm
Project consists of security upgrades to the parking structure located at 600 Pearl St. Eugene, i... |
09/14/2021 | ||
|
Boiler Safety Device Testing 9/10/21 5pm
Furnish the necessary personnel, material & expertise to provide Annual Boiler Plant Safety D... |
09/10/2021 | ||
|
Medford SD Gym Seismic Retrofit 9/22/21 2pm
Work includes but not limited to: Demolition, Concrete, Masonry, Structural Steel Framing, Steel ... |
09/08/2021 | 09/22/2021 | |
|
Duff WTP Ozone Equipment 9/21/21 2pm
Removal of existing Ozone System Equipment and installation of the new Owner provided Ozone Syste... |
09/21/2021 | ||
|
Southern Oregon Seismic Bridge Retro Ph 2 9/16/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
09/16/2021 | ||
|
US20 Ward/Hamby Intersection 9/16/21 9am
1. Construct earthwork and drainage for a new roundabout. |
09/16/2021 | ||
|
Pond 1 Sludge Removal 9/7/21 2pm
Stockpile, load and haul approximately 17,400 cubic yards (or 16,000 tons) of biosolids from the ... |
09/07/2021 | ||
|
Replace AC Surfacing 2021 9/7/21 3pm
Street surface preparation, approximately 126,600 cubic feet of replace AC surfacing, traffic con... |
09/07/2021 | ||
|
Sidewalk Access Ramp Improvements 9/7/21 2:30pm
This project includes both replacing existing, and constructing new sidewalk access ramps at mult... |
09/07/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.