Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
District 7 US101 Pavement Patching 5/10/21 3pm
Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tac... |
05/10/2021 | ||
|
Myrtle Point Sidewalk Repairs 5/3/21 2pm
Materials, equipment and labor to perform the following work, located between MP 21.5 and MP 21.8... |
05/03/2021 | ||
|
Seismic Rehab Fire Station 4 5/13/21 4pm
The seismic retrofit of Fire Station 4 includes rehabilitation to the existing lateral system com... |
05/04/2021 | 05/13/2021 | |
|
Dollar General Redding 5/10/21 4pm
10,640 SF Dollar General Plus going up in Bella Vista, CA. Trades include, but are not limited to... |
05/10/2021 | ||
|
NE Hemlock HWY 97 to NE 9th St. 5/12/21 2pm
Installation of approx. 250 LF of new 12″ Ductile Iron Waterline, new stormwater facilities... |
05/12/2021 | ||
|
Hedrick MS Sidewalk Replace 5/18/21 2pm
Furnish and install all materials and equipment pertaining to the removal and replacement of the ... |
05/04/2021 | 05/18/2021 | |
|
D & S Harley Davidson 5/13/21 1pm
Architectural Trades Only |
05/13/2021 | ||
|
BMF Process Control System Upgrade 5/12/21 2:30pm
Biosolids Management Facility Process Control System Upgrade for the City of Eugene. |
05/12/2021 | ||
|
ESB OR140 Delineators 5/6/21 10am
Contractor shall remove and return to ODOT existing ground anchored delineators and provide and i... |
05/06/2021 | ||
|
EWEB Exterior Window Washing 5/5/21 2pm
The work requires furnishing all labor, equipment, supplies and supervision necessary to clean al... |
05/05/2021 | ||
| Title | Site Walk Through | Deadline |