Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
UPS Distribution Facility 1/22/21 11am
Project consists of a PEMB building that is approximately 42,144 sf with interior multiple floor ... |
01/22/2021 | ||
Cook St. Sewer Replacement 1/28/21 2pm
Work shall include, but not necessarily be limited to: Construction of 8 inch sewer main, manhole... |
01/19/2021 | 01/28/2021 | |
Maple Avenue Staircase 2/10/21 2pm
Construction of a staircase leading into the Dry Canyon. The Project includes a stairway that tra... |
02/10/2021 | ||
RFQ Port of Coos Bay Rail Line 2/4/21 3pm
The Port intends to award three different Contracts for On Call Railway Bridge Repair work as wor... |
02/04/2021 | ||
US101 Culvert & Fish Passage Upgrades 1/28/20 9am
Earthwork and Drainage. |
01/28/2021 | ||
Fred Meyer Brookings 1/28/21 10am
Including, but not limited to: restripe parking lot, demolition, concrete patching (refer to plum... |
01/28/2021 | ||
Del Norte USD HVAC 1/28/21 2pm
DEMOLITION AND REPLACEMENT OF (E) HVAC UNITS AT THE FOLLOWING SCHOOL SITES : |
01/15/2021 | 01/28/2021 | |
Beaver Hill Pit Roof Structure 2/18/21 2pm
Work on this Project shall consist of the construction of an approximately 20,730 square foot pre... |
01/25/2021 | 02/18/2021 | |
SW Sewer Basin Phases 1 & 2 Extension 2/9/21 2pm
The Scope of Work includes, but is not limited to, trenching and installation of gravity sewer pi... |
02/09/2021 | ||
Bulk Water Station Addition 1/26/21 10am
The work under this project includes all materials, labor, and equipment necessary for grading, u... |
01/26/2021 | ||
Title | Site Walk Through | Deadline |