Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
COID Pilot Butte Small Diameter Pipe 7/1/21 2:00pm
Piping currently open irrigations canals in multiple segments. This includes piping of the mainli... |
07/01/2021 | ||
|
COID Pilot Butte Canal Precast Concrete 7/1/21 2:00pm
Piping currently open irrigations canals in multiple segments. This includes piping of the mainli... |
07/01/2021 | ||
|
E 40th Ave Storage Tank Tree Remove 6/10/21 2pm
The project will require the removal and disposal of approximately 265 trees, installation of 1,7... |
06/02/2021 | 06/10/2021 | |
|
Platt Ave Curb Gutter Paving 6/15/21 11am
Curb and Gutter, Paving, Grading |
06/15/2021 | ||
|
ERD Parcel 3BC MEP Design Build 6/14/21 2pm
The project is four-story apartment building that is “C” shaped in plan with an area of appro... |
06/14/2021 | ||
|
Southwest Airlines Offices 6/8/21 2:30pm
Tenant improvements at ground and upper floors of the A Gates area and minor work at the baggage ... |
06/01/2021 | 06/08/2021 | |
|
Wilson Corridor Improvement Project 6/23/21 3pm
Modernizing Wilson Avenue from Douglas Street to 15th Street. The intersections of 9th Street and... |
06/08/2021 | 06/23/2021 | |
|
Local Road Safety Plan 6/21/21 5pm
Development and preparation of a Local Roadway Safety Plan (LRSP). The purpose of the plan must a... |
06/21/2021 | ||
|
Ventura Circle Underground Conduit 6/9/21 3pm
The City of Ashland (COA) is seeking bids for Underground Primary/Infrastructure as per the attac... |
06/02/2021 | 06/09/2021 | |
|
Buster Butte Road Sub Soiling 6/9/21 2pm
Restore skid roads and temporary roads to soil conditions that existed prior to logging activitie... |
05/26/2021 | 06/09/2021 | |
| Title | Site Walk Through | Deadline |