Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
4th St. Paving & Restoration 5/5/21 2pm
Includes excavation, curb & gutter remove/replace, asphalt & tack coat. |
05/05/2021 | ||
Padmount Switch 25kv 5/6/21 2pm
This specification covers three phase dead-front, 25 kV air insulated padmount |
05/06/2021 | ||
Electrical Deficiencies Roseburg VA 5/26/21 2pm
Contract is to correct electrical deficiencies campus wide at the Roseburg VAMC. P... |
05/26/2021 | ||
Jewett Dr. Stormwater & Waterline 5/25/21 2pm
This project consists of creek restoration, storm drainage improvements, water distribution syste... |
05/25/2021 | ||
OSU Arts & Education Complex #1 5/19/21 2pm
Prepare the existing site for the future Arts and Education Complex (“AEC”) Project. Located ... |
04/30/2021 | 05/19/2021 | |
Willakenzie Substation Fence Installation 5/13/21 2pm
Installation of a composite fence around EWEB’s ... |
05/12/2021 | ||
ESB OR140 Lakeview Compound Fencing 5/11/21 2pm
Work includes removing and replacing the existing barbwire fence with a 6 foot chain link fence i... |
05/11/2021 | ||
District 7 US101 Pavement Patching 5/10/21 3pm
Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tac... |
05/10/2021 | ||
Myrtle Point Sidewalk Repairs 5/3/21 2pm
Materials, equipment and labor to perform the following work, located between MP 21.5 and MP 21.8... |
05/03/2021 | ||
Seismic Rehab Fire Station 4 5/13/21 4pm
The seismic retrofit of Fire Station 4 includes rehabilitation to the existing lateral system com... |
05/04/2021 | 05/13/2021 | |
Title | Site Walk Through | Deadline |