| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Office Covered Bridge Old Mill Rd. 3/22/22 10am This project is to clean, prepare and paint interior and exterior existing painted surfaces of the H... | 03/22/2022 | ||
| EC Cares 100 101 Reception Remodel 3/23/22 2pm The Project includes a remodel of the reception and entry area with associated casework, framing, ME... | 03/02/2022 | 03/23/2022 | |
| Butler Market Wells & Boyd Acres Improve 3/29/22 3pm Provide the design services necessary for the Butler Market & Wells Acres & Boyd Acres Impro... | 03/29/2022 | ||
| CBNB Water Board Project 3/17/22 2pm Work consists of wall repair, casework replacement, Diebold window and door coordination, ballard in... | 03/07/2022 | 03/17/2022 | |
| SSSD Phase 4 Sewer Line Rehab 3/15/22 2pm Complete 27 lateral rehabilitations and 4,629 lineal feet of cured in place sewer pipe repairs. | 03/15/2022 | ||
| Design Build Muni Pool Replace 3/7/22 2pm This request for proposals is for a design-build contract intended to replace the existing pool reci... | 03/07/2022 | ||
| 2022 Lane Co. Slurry Seal Project 3/15/22 10am The approximate quantities are: 275,000 square yards of Type II Slurry Seal and all other work calle... | 03/15/2022 | ||
| 2022 Site Improvement Modoc HS 3/15/22 2pm The work at Modoc High School consists of Surface preparation and 2 inch HMA overlays; performing Tr... | 03/01/2022 | 03/15/2022 | |
| Brophy Pump Station Abandonment 3/8/22 2:15 pm The construction of 1,305 feet of 8 inch gravity sewer, 647 feet of 4 inch pressure sewer, 6 manhole... | 03/02/2022 | 03/08/2022 | |
| Centennial Overlay Aspen to Prescott 3/16/22 2pm The Project consists of a pavement inlay; Americans with Disability Act (ADA) upgrades to existing c... | 02/28/2022 | 03/16/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.