| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Pruner Rd. Intersection Improvements 2/2/22 8:30am
The work to be done under this contract consists of the following on the Traffic Control Project ... |
02/02/2022 | ||
|
Coburg Rd. Ferry St. RR Bridge to Willamette 1/25/22 2pm
The scope of work for this contract includes: 1. Install and remove temporary traffic control and... |
01/25/2022 | ||
|
JCFD #5 Seismic Rehab CM/GC **Withdrawn**
Project includes structural upgrades bring the facility up to an essential facility. It also incl... |
01/05/2022 | 01/27/2022 | |
|
New Water Meters 2/1/22 3pm
700 New Residential Water Meters |
02/01/2022 | ||
|
The Dalles California HWY Culverts Project 1-13-22 9am
Construct repairs on existing culverts along US97 by rehabilitating or replacing pipes. |
01/13/2022 | ||
|
KCC Photovoltaic Services 1/11/21 3pm
Klamath Community College is requesting proposals from qualified firms to provide Photovoltaic se... |
01/11/2022 | ||
|
KCC Fire Tower Training Structure 1/11/22 2pm
Design a Fire Tower training system that will work with drawings and specification for the projec... |
01/11/2022 | ||
|
McCornack ES Asbestos Flooring 1/13/22 2pm
Removal of non-asbestos containing floor tile, and asbestos containing floor tile mastic and cove... |
12/30/2021 | 01/13/2022 | |
|
Sheldon HS Asbestos Flooring 1/13/22 2pm
Work is described as the removal of asbestos containing floor tile, floor tile mastic and cove ba... |
12/30/2021 | 01/13/2022 | |
|
Group 1 Pump Station 2/1/22 2pm
Demolition and reconstruction of two irrigation pump stations. • The existing Barnes Butte Pump... |
01/06/2022 | 02/01/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.