Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
RCC Ceramics Building Redwood Campus 10/11/21 2pm
Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceram... |
09/28/2021 | 10/11/2021 | |
|
California Alley Utility Improve 10/14/21 3pm
Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street... |
10/14/2021 | ||
|
Design Build Winston Dillard SD Offices 11/4/21 2pm
The building must have twelve (12) offices as detailed: |
11/04/2021 | ||
|
Evergreen Family Medicine Office 10/7/21 4pm
Adroit Construction Company is seeking subcontractor bids for work including but |
10/07/2021 | ||
|
Peoples Irrigation Pipe Install 10/5/21 2pm
Mobilize, perform selective demolition, install a furnished approximate 1,893 LF of 48-inch diame... |
09/23/2021 | 10/05/2021 | |
|
Water Quality Improvements Project 10/19/21 2pm
Construct a new chemical storage and dosing building at the Robert A. Duff Water Treatment Plant ... |
10/19/2021 | ||
|
Solid Waste Beaver Hill Fence Project 10/5/21 2pm
Install new 7-foot chain link fence including all hardware, post, rails, and braces with new thre... |
09/16/2021 | 10/05/2021 | |
|
7th & Minnesota Road Rehab 9/28/21 2pm
South 7th Street Road Rehabilitation – Work includes new asphalt concrete pavement, aggrega... |
09/28/2021 | ||
|
KTHA Stove Cleaning 9/24/21 5pm
All necessary materials, labor, equipment, permits, and fees needed to annually clean and inspect... |
09/24/2021 | ||
|
Yreka Security Fence Upgrades 9/21/21 1pm
Repair/Replace chain link fence, razor wire, barbed wire, barbed wire arms, structure weight post... |
09/21/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.