Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
OR36 Indian Creek Bridge 7/15/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
07/15/2021 | ||
|
Fowlers Campground Tree Removal 7/20/21 10am
The Shasta-McCloud Management Unit is requesting a logging company or tree service to remove 170 ... |
07/20/2021 | ||
|
Madrona #2 Sewer & Pavement 7/20/21 2pm
Removal and preparation of street, prepare and pave back 750 tons of Level 2 HMAC, replacement of... |
07/09/2021 | 07/20/2021 | |
|
Gym Facility Remodel 8/6/21 4pm
5,824 square foot project converting the Karuk “Old Gym” into a community center, kit... |
07/07/2021 | 08/06/2021 | |
|
South Umpqua HS Covered Walkway 7/8/21 2pm
Work on this project consists of the remodel and enclosure of an existing covered walkway on the ... |
06/24/2021 | 07/08/2021 | |
|
Foundation & Drainage Winston Middle School 7/8/21 2pm
The Winston Dillard School District requests sealed Bids from qualified Bidders for the Foundatio... |
06/24/2021 | 07/08/2021 | |
|
Alderpoint Rd. MP40 Storm Damage 7/27/21 2pm
The work to be done consists of traffic control systems, reinforced roadways, reconstructed emban... |
07/27/2021 | ||
|
CM/GC Health Professions Building 7/16/21 2pm
The selected CM/GC firm will provide construction management and general contracting services, st... |
07/07/2021 | 07/16/2021 | |
|
HVAC Powell Butte Charter School 7/7/21 1pm
Select a Design-Build contractor to develop projects that will improve the indoor air quality and... |
07/07/2021 | ||
|
Head Start Facility Renovation 6/28/21 5pm
Remove and dispose of all flooring, cabinets, and kitchen island. Install approximately 300 squar... |
06/28/2021 | ||
| Title | Site Walk Through | Deadline |