Shasta Place Apartments Remodel 10/7/21 2pm
The project will be a remodel of the exterior and interior of Shasta Place Apartments located at ... |
10/07/2021 | ||
|
Fuel Pad Parking Cover 9/21/21 2pm
The work in general consists of providing all material, labor and equipment necessary to complete... |
09/07/2021 | 09/21/2021 | |
|
Parking Structure Security Upgrade Rebid 9/14/21 2pm
Project consists of security upgrades to the parking structure located at 600 Pearl St. Eugene, i... |
09/14/2021 | ||
|
Boiler Safety Device Testing 9/10/21 5pm
Furnish the necessary personnel, material & expertise to provide Annual Boiler Plant Safety D... |
09/10/2021 | ||
|
Medford SD Gym Seismic Retrofit 9/22/21 2pm
Work includes but not limited to: Demolition, Concrete, Masonry, Structural Steel Framing, Steel ... |
09/08/2021 | 09/22/2021 | |
|
Duff WTP Ozone Equipment 9/21/21 2pm
Removal of existing Ozone System Equipment and installation of the new Owner provided Ozone Syste... |
09/21/2021 | ||
|
Southern Oregon Seismic Bridge Retro Ph 2 9/16/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
09/16/2021 | ||
|
US20 Ward/Hamby Intersection 9/16/21 9am
1. Construct earthwork and drainage for a new roundabout. |
09/16/2021 | ||
|
Pond 1 Sludge Removal 9/7/21 2pm
Stockpile, load and haul approximately 17,400 cubic yards (or 16,000 tons) of biosolids from the ... |
09/07/2021 | ||
|
Replace AC Surfacing 2021 9/7/21 3pm
Street surface preparation, approximately 126,600 cubic feet of replace AC surfacing, traffic con... |
09/07/2021 | ||