Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
I-5 MP 85 Culvert Repair Rebid 4/20/21 3pm
Culvert repair and replacement including traffic control and construction of temporary water mana... |
04/20/2021 | ||
Enhance & Expand Parking Lot Areas 5/6/21 1:00pm
Excavation of existing parking lots and regrading to accommodate ADA standards |
04/19/2021 | 05/06/2021 | |
West 13th Ave. & Dani St. Stormwater 4/22/21 2pm
563 CY General Excavation; 1 LS Clearing and Grubbing; 40 FT Drain Pipe, 6 Inch Perforated PVC w/... |
04/22/2021 | ||
Murphy Booster Pump Station 5/5/21 2pm
Expand the pumping capacity of the existing Murphy Pump Station to cover a more broad flow range.... |
05/05/2021 | ||
UO Ponisio Lab & 3rd Floor 4/23/21 12pm
Build new wall to divide 368 into two separate labs. New flooring, casework, lighting and utiliti... |
04/23/2021 | ||
Douglas Electric Co-Op 5/4/21 2pm
New construction of a 2-story 14,250 sqft office building, and adjacent 8,000 sqft Pre-Engineered... |
04/20/2021 | 05/04/2021 | |
Eugene Town Square Parking Demo 4/20/21 2pm
Scope includes demolition of a partial subgrade, 2 level concrete parking garage, associated util... |
04/20/2021 | ||
Lane CC Building 19 Seismic 4/28/21 4pm
Demolition, structural steel fab/erect, concrete, masonry, rough carpentry, sheet metal roofing/f... |
04/19/2021 | 04/28/2021 | |
Yoncalla HS Steel Buildings 4/20/21 2pm
General site excavation, driveway and access road construction; Installation of baserock, sidewal... |
04/20/2021 | ||
Churn Creek & Maraglia Safety 5/6/21 3pm
Completion of bike and pedestrian improvements on Churn Creek Road between Hartnell Avenue and Ea... |
05/06/2021 | ||
Title | Site Walk Through | Deadline |