| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| High Tank Booster Pump Station 6/2/22 2pm This project consists, in general, of construction of a new potable water booster pumping facility i... | 05/17/2022 | 06/02/2022 | |
| Odem Medo Salmon Realignment 5/25/22 2pm Installation of approx. 2745 SY of new asphalt roadway, and 475 LF of new 8” DI waterline, new storm... | 05/25/2022 | ||
| Airport Terminal Roof Replace **Cancelled** Work shall include, but not necessarily be limited to: Remove existing roofing materials and replace... | 05/12/2022 | - | |
| Garden Ave. Apartments 5/18/22 2pm New construction of a 5-story apartments building in Eugene OR with 84 units. Scope includes but is ... | 05/18/2022 | ||
| Douglas HS Lower Parking Lot 6/21/22 3pm Project includes site development , including excavation, concrete, paving, landscaping, and irrigat... | 05/06/2022 | 06/21/2022 | |
| Douglas HS Culinary Classroom Rebid 8/2/22 3pm Project includes demolishing existing kitchen, classroom remodel, and updating sanitary lines and gr... | 08/02/2022 | ||
| Douglas HS Auditorium Refresh 5/25/22 3pm Building construction and remodeling, including general construction and electrical work. | 05/06/2022 | 05/25/2022 | |
| Transpacific Pkwy Drainage Improve 6/8/22 2pm The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grinding,... | 05/17/2022 | 06/08/2022 | |
| Polk St. Water Main Replace 5/19/22 2pm The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street from... | 05/19/2022 | ||
| Oakdale Middle School Furniture 5/25/22 2pm School and office furniture for our new middle school, currently under construction. The new school ... | 05/25/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.