Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
GP Oil Stop & Car Wash 3/17/21 2pm
Ground up construction of car wash and oil stop. Specs are included with the plans. |
03/17/2021 | ||
Chemult Maintenance Shop Asbestos 3/24/21 11am
Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or a... |
03/24/2021 | ||
Windsor Cir. 36th & 38th Pavement 3/19/21 2pm
Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay... |
03/19/2021 | ||
Half Moon Bay Shop Flatwork 3/30/21 2pm
Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prep... |
03/12/2021 | 03/30/2021 | |
Tank 1 & Roseburg Water System Project 5/4/21 2pm
The Project consists of construction of approximately 8,300 feet of 12-inch water main, one welde... |
03/15/2021 | 05/04/2021 | |
Replace BMF Heaters at USCG Coos Bay 3/30/21 5pm
Replace existing hydronic boiler with new energy efficient |
03/15/2021 | 03/30/2021 | |
Stewart Parkway End Panel Repair 3/30/21 2pm
Construction of replacement of the bridge end panels of the Stewart Parkway Bridge. |
03/25/2021 | ||
Madison Elementary School Renovation 4/1/21 4pm
The Project consists of major renovations to the existing Madison Elementary School Building. The... |
03/12/2021 | 04/01/2021 | |
2021 Pavement Maintenance Sisters 3/17/21 2pm
Improvements generally include grind & inlay of asphalt pavement on portions of Main Avenue a... |
03/17/2021 | ||
COIC RFQ for A & E Services 3/19/21 4pm
This project will be to design & engineer permanent bus stop pads, signage, benches, shelters... |
03/19/2021 | ||
Title | Site Walk Through | Deadline |