Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Yreka Security Fence Upgrades 9/21/21 1pm
Repair/Replace chain link fence, razor wire, barbed wire, barbed wire arms, structure weight post... |
09/21/2021 | ||
|
EWEB 3 Phase Substation Regulators 10/7/21 2pm
Two 1500/2000 KVA 3φ step voltage regulators that are to be matched with 12/16/20 MVA 11... |
10/07/2021 | ||
|
2021 Paving Eagle Point 9/21/21 2:30pm
This project consists of furnishing all labor, equipment, and materials necessary for paving the ... |
09/21/2021 | ||
|
Table Rock Motel Phase 2 9/28/21 5pm
Replace & add units to the existing Table Rock Motel and other improvements. The buildings co... |
09/28/2021 | ||
|
Landfill Leachette Pre-Treatment Plant 11/9/21 2pm
The construction of a new Leachate Pre-Treatment Plant at the Roseburg Landfill, including the su... |
11/09/2021 | ||
|
Architectural Design New Residence Hall 10/12/21 1pm
Architectural and engineering design and construction administration services are required throug... |
09/23/2021 | 10/12/2021 | |
|
3 Phase Pad Type Transformers 9/28/21 3pm
It is the intent of these specifications to obtain, for the City of Redding Electric Utility, tra... |
09/28/2021 | ||
|
Supply & Deliver Generators Whiskeytown 9/16/21 2pm
Supply and delivery nine (9) backup generators and nine (9) transfer switches. |
09/16/2021 | ||
|
2021 Chipseal Project 9/16/21 2pm
The Project involves two (2) City streets, two (2) parking lots and an area at the City corporati... |
09/09/2021 | 09/16/2021 | |
|
BLM Lane Mtn. Radio Facility 9/30/21 11am
Procurement, delivery and installation of a new communications tower. |
09/10/2021 | 09/30/2021 | |
| Title | Site Walk Through | Deadline |