Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Milam Hall Roof Replacement 2/21/22 2pm
This project consists of re-roofing the entire building (28,000 sf), |
02/02/2022 | 02/21/2022 | |
|
Ponderosa Elem Ceiling Fan Add 2/8/22 3:30pm
Installation of ceiling fans and controls |
01/26/2022 | 02/08/2022 | |
|
Generator Install Yreka Clinic 2/21/22 5pm
Install of a 300kW emergency generator to supply power for the Karuk Medical/Dental clinic locate... |
02/21/2022 | ||
|
115kv Air Switches for Currin Substation 2/10/22 2pm
The new Currin Substation design requires 25 sets of 115kv air switches. |
02/10/2022 | ||
|
City of Gold Beach 2021 WTP Improve 3/1/22 2pm
a. Demolition and removal of existing raw water intake building, controls, valve vault, |
02/01/2022 | 03/01/2022 | |
|
Quartz Neighborhood Park 2/23/22 2pm
The project includes 6.4 acres of new park development including a parking lot, pedestrian paving... |
02/01/2022 | 02/23/2022 | |
|
Walton MV Service & Switch Install 2/11/22 3pm
Purchase and installation of two (2) pad mount medium voltage dielectric switches, provide MV cab... |
01/27/2022 | 02/11/2022 | |
|
West Valley View Raod Improvements 2/17/22 2pm
Work associated with this project includes grinding existing asphalt and repaving West Valley Vie... |
02/17/2022 | ||
|
Ross Store #2402 S Medford 2/17/22 1pm
Tenant Improvement of a new 18,971 SF Ross Store. To include, but not limited to: demolition, ... |
02/17/2022 | ||
|
Districtwide Restroom Renovations 2/16/22 2pm
Restrooms to be individual rooms with full height walls, hollow metal frames with wood doors. Spe... |
02/16/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.