| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 192 Clear Creek Mixed Use 6/15/22 5pm Mixed use building with two commercial units on lower floor and two-story duplex on top two floors. | 06/15/2022 | ||
| Amacher Boat Ramp Parking Lot 6/21/22 2pm Demolition of existing asphalt access road and parking Construct concrete launch ramp in the dry Con... | 06/06/2022 | 06/21/2022 | |
| Reser Stadium West Side Food Service Equip 6/14/22 2pm Provide and install food service equipment | 06/01/2022 | 06/14/2022 | |
| Safeway Store #397 Grants Pass 6/23/22 2pm Interior remodel and exterior improvements of an existing and operating 31,648 square foot Safeway G... | 06/23/2022 | ||
| Collector St. Maintenance & Preservation 6/13/22 2pm The work includes the furnishing of the labor, materials, and equipment for Mill & Inlay, Genera... | 06/13/2022 | ||
| Head Start Stair Replace 5/31/22 5pm Removal and disposal of the existing front wooden and concrete steps, and also the existing metal ha... | 05/31/2022 | ||
| Mountain View HS AV Project 6/9/22 2pm Supplying and installing approx. 50 classrooms with AV equipment. | 06/01/2022 | 06/09/2022 | |
| Terminal Spur Sanitary Sewer 7/5/22 2pm Construct approximately 2,570 feet of 24-inch sanitary sewer, with manholes, remove 2,095 feet of 18... | 06/01/2022 | 07/05/2022 | |
| Bay Area Hospital Storage Facility 6/6/22 5pm Construction of a pre-engineered metal building, approximately 50 foot by 80 foot, 4,000 square foot... | 06/06/2022 | ||
| Homefront Parking Lot 6/23/22 2pm Parking lot repairs and possible addition of ramps in accordance with the County’s Americans with Di... | 06/23/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.