Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Airport Passenger Bridge Electrical Upgrade 10/19/21 2:30pm
Work includes providing electrical, mechanical, and civil design services and construction phase ... |
10/19/2021 | ||
|
Rogue Community Health HVAC 10/19/21 4pm
This work shall include demolition/disposal, furnishing all labor, materials, equipment, and serv... |
10/19/2021 | ||
|
Digital Control System Replace 11/1/21 1pm
The scope of services includes replacing the existing controls system, separating the lighting co... |
10/05/2021 | 11/01/2021 | |
|
Environmental Cleanup S Foothill Brownfield 10/14/21 5pm
The purpose of this project is to mitigate the health risk of future site users from potential ex... |
10/14/2021 | ||
|
Willamette Sand Media Placement 10/5/21 2pm
Flipping the old and new sand through the trench. Excavate and dispose of the dirty sand from edg... |
09/30/2021 | 10/05/2021 | |
|
Old 99N Oakland Br. & Melrose 10/28/21 9am
1. Install temporary traffic control. | |||
|
CM/GC Willamette Connection 10/6/21 2pm
CM/GC services for the Hult Plaza Willamette Connection Project. The goals of the project are to ... |
10/06/2021 | ||
|
Lane Co. Navigation Center 10/19/21 2pm
The Project consists of the general construction services for the remodel of an 18,000 square foo... |
10/19/2021 | ||
|
Englewood School Brownfield Rebid 10/12/21 2pm
The Project entails demolition and removal of an existing fire damaged school building including:... |
10/05/2021 | 10/12/2021 | |
|
Hanby MS Asbestos Abatement 10/7/21 2pm
Asbestos Removal in floors, walls, ceiling and windows throughout school. |
09/30/2021 | 10/07/2021 | |
| Title | Site Walk Through | Deadline |