Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Highway 97 Fencing MP 179-183 7/22/21 11am
Work includes installing wildlife fencing on the East and West sides of Hwy 97 between MP 179.97 ... |
07/22/2021 | ||
Willamette SSFP Improvements 8/5/21 2pm
Excavation for & construction of cast-in-place concrete curb wall, as indicated in drawings. ... |
07/07/2021 | 08/05/2021 | |
RCU Steel & Metal Building 7/13/21 5pm
New Construction of a single story pre-engineered metal building and storage build-outs for the &... |
07/13/2021 | ||
Brussells St. Pavement Replace 7/21/21 2pm
Remove approximately 5000 SY of existing asphaltic concrete surface and pave back 900 tons of Lev... |
07/13/2021 | 07/21/2021 | |
New Jet-A Fueling System Rebid 8/17/21 2pm
Fabricate and install NEW JET-A AIRCRAFT FUELING SYSTEM EQUIPMENT at the Grants Pass Airport. Maj... |
08/17/2021 | ||
Half Moon Bay Shop Building 7/27/21 2pm
Construction of a shop building 30 feet by 62 feet per engineered drawings |
07/27/2021 | ||
US97/US20 Bend N Corridor Design Build 8/18/21 9am
This re-evaluation assesses the effect of environmental statutes, regulations, policies and guida... |
08/18/2021 | ||
Stillwater Business Park Lighting 7/15/21 3pm
Install seven street lights along the south side of Venture Parkway from Old Oregon Trail to Stil... |
07/15/2021 | ||
Carr Fire Buenaventura Bridges 7/30/21 3pm
Install nine pedestrian bridges along the Buenaventura Trail that were burned during the 2018 Red... |
07/30/2021 | ||
Single Phase Distribution Transformers 7/19/21 3pm
SINGLE-PHASE, PAD-TYPE DISTRIBUTION TRANSFORMERS 12kV-240/120V, Single Phase |
07/19/2021 | ||
Title | Site Walk Through | Deadline |