Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
2022 Multisite Wood Floor Refinishing 2/24/22 2pm
Screen and recoat of 12 wood floors at 8 sites. Also the sanding and finishing of one classroom.<... |
02/24/2022 | ||
|
2022 Guardrail Improvements 2/23/22 2pm
Install and maintain temporary traffic control. Install guardrail and appurtenant elements. The v... |
02/23/2022 | ||
|
Renaissance Flats Apts. 2/24/22 2pm
72 Unit Apartment Complex and Clubhouse approximately 69,048 SF. Adroit Construction Compa... |
02/24/2022 | ||
|
SOU Conceptual Design Indigenous Garden 3/31/22 4pm
This RFQ seeks information that will supplement SOU’s exploration of a conceptual design for an... |
03/05/2022 | 03/31/2022 | |
|
Bridge Deck Overlay 3/1/22 10am
The approximate quantities are: 54 square yards Class 2 Preparation (Big Fall Creek Rd.), 480 squ... |
03/01/2022 | ||
|
2022 Roadway Repairs 2/22/22 2pm
This project consists of removal of existing ramps, curbs, and gutters, pavement removal, grindin... |
02/22/2022 | ||
|
Multisite Painting 2022 2/24/22 2pm
Preparing and painting the entire exterior of the school, along with application of water repella... |
02/10/2022 | 02/24/2022 | |
|
2022 Seal Coat Liquid Roads Ultra 3/11/22 1pm
The 2022 Seal Coat “Liquid Roads Ultra” Project will consist of approximately 342,000... |
03/11/2022 | ||
|
UO Baker Center Roof Replace Ph2 Area F 3/1/22 2pm
Removal of existing roof assemblies and installation of new roofing assemblies and flashing with ... |
02/08/2022 | 03/01/2022 | |
|
Runway 16-34 Seal Coat & Guidance Sign 3/3/22 2pm
The Project generally consists of minor crack repair, wide crack repair, pavement marking removal... |
02/14/2022 | 03/03/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.