Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Electrical Maintenance Services 7/20/21 3pm
Provide supervisory electrical maintenance services for the municipal water and wastewater system... |
07/12/2021 | 07/20/2021 | |
Main St. Sewer Interceptor 7/29/21 2pm
The Project consists of installing 915 feet of 20-inch, 910 feet of 18-inch gravity sewer main in... |
07/08/2021 | 07/29/2021 | |
Southern Coos Hospital Roof Replace 7-21-21 2pm
Replacement of the roof of the Southern Coos Hospital & Health Center. |
07/06/2021 | 07/21/2021 | |
US20 Mervin Sampels – Greenwood 7/29/21 9am
Construct curbs, sidewalks and ADA ramps. |
07/29/2021 | ||
Highway 97 Fencing MP 179-183 7/22/21 11am
Work includes installing wildlife fencing on the East and West sides of Hwy 97 between MP 179.97 ... |
07/22/2021 | ||
Willamette SSFP Improvements 8/5/21 2pm
Excavation for & construction of cast-in-place concrete curb wall, as indicated in drawings. ... |
07/07/2021 | 08/05/2021 | |
RCU Steel & Metal Building 7/13/21 5pm
New Construction of a single story pre-engineered metal building and storage build-outs for the &... |
07/13/2021 | ||
Brussells St. Pavement Replace 7/21/21 2pm
Remove approximately 5000 SY of existing asphaltic concrete surface and pave back 900 tons of Lev... |
07/13/2021 | 07/21/2021 | |
New Jet-A Fueling System Rebid 8/17/21 2pm
Fabricate and install NEW JET-A AIRCRAFT FUELING SYSTEM EQUIPMENT at the Grants Pass Airport. Maj... |
08/17/2021 | ||
Half Moon Bay Shop Building 7/27/21 2pm
Construction of a shop building 30 feet by 62 feet per engineered drawings |
07/27/2021 | ||
Title | Site Walk Through | Deadline |