| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Bisulfite Building Project 9/1/22 2pm The proposed work consists of site preparation, extension of utilities, and construction of a 21’-4”... | 08/12/2022 | 09/01/2022 | |
| Preserve Stone Parapets Lassen NP 9/2/22 2pm The work of this project includes removing, salvaging, cleaning, testing, and reconstructing a segme... | 09/02/2022 | ||
| Willamette Sand Media Replacement 8/16/22 2pm A. Flipping the old and new sand through the trench method. This method is use in order to not place... | 08/16/2022 | ||
| H2O Meter Backwash Pump SCADA Sched B 9/15/22 3pm The Project consists of replacing aging manual-read water meters with AMR water meters, installing A... | 08/11/2022 | 09/15/2022 | |
| Roseburg Dist Hazard Tree Removal 8/19/22 2pm This statement of work will be issued as a firm-fixed price contract for Roseburg District Hazard Tr... | 08/19/2022 | ||
| Fencing for Whiskeytown Rec Area 9/6/22 3pm Remove Old Security Perimeter Fencing and Install New Perimeter Security Fencing and Security Gates ... | 09/06/2022 | ||
| Rancheria Logging Services 8/31/22 2pm Commercial thinning (“logging”) will be focused on two areas – one immediately west of the Big... | 08/11/2022 | 08/31/2022 | |
| Marble View Home Rehab 9/9/22 5pm The Karuk Tribe Housing Authority (KTHA) requests lump sum fixed-price quotations for all necessary ... | 09/09/2022 | ||
| OR99/I-5 Water Quality Treatment Repair 8/25/22 9am 1. Install temporary traffic control. 2. Construct water quality swales, water quality manhole refur... | 08/25/2022 | ||
| Foothill Rd. Delta Waters to Dry Creek 9/15/22 9am 1. Install and remove temporary traffic control and erosion control measures. 2. Install drainage pi... | 09/15/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.