| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Mountain View HS AV Project 6/9/22 2pm
Supplying and installing approx. 50 classrooms with AV equipment. |
06/01/2022 | 06/09/2022 | |
|
Terminal Spur Sanitary Sewer 7/5/22 2pm
Construct approximately 2,570 feet of 24-inch sanitary sewer, with manholes, remove 2,095 feet of... |
06/01/2022 | 07/05/2022 | |
|
Bay Area Hospital Storage Facility 6/6/22 5pm
Construction of a pre-engineered metal building, approximately 50 foot by 80 foot, 4,000 square f... |
06/06/2022 | ||
|
Homefront Parking Lot 6/23/22 2pm
Parking lot repairs and possible addition of ramps in accordance with the County’s Americans wi... |
06/23/2022 | ||
|
3rd St. Geothermal Mainline Replace 6/9/22 2pm
Asphalt pavement removal, trench excavation, removal and disposal (or salvage) of existing waterl... |
05/31/2022 | 06/09/2022 | |
|
Valley Inn Restaurant Design Build 6/30/22 5pm
The Hoopa Valley Tribe will be accepting Design-Build proposals from qualified Contractors for th... |
06/30/2022 | ||
|
Spiegelberg Stadium Lighting 6/15/22 2pm
New LED lighting system and electrical upgrades at Spiegelberg Stadium. |
05/27/2022 | 06/15/2022 | |
|
Wastewater Rehab Harlow Cleanouts 6/2/22 2pm
Installation of cleanouts on existing wastewater service laterals; Installation of new wastewater... |
06/02/2022 | ||
|
US97 at Wickup JCT 6/16/22 9am
1. Construct a shared use path between Burgess Road and 1st Street in La Pine. |
06/16/2022 | ||
|
Whiskeytown Fuels Reduction 6/21/22 2pm
The objective of the Whiskeytown Hazardous Fuels Project is to reduce the hazardous fuels in clos... |
06/21/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.