Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Coos Bay North Jetty Repair 9/1/21 11am
Proposed Coos Bay North Jetty mandatory work includes toe, side slope, and crest repair construct... |
09/01/2021 | ||
COCC Boyle Chiller 8/26/21 4pm
Remove and replace Boyle Education Center chilled water system. |
08/04/2021 | 08/26/2021 | |
Thermal Storage Tank Design Build 8/18/21 2pm
Design and construction of a Thermal Storage Tank (TES tank). Detailed scope of the work includ... |
08/18/2021 | ||
COCC Building 3 Boilers 8/26/21 4pm
Removing existing Building 3 boilers and replacing said system. |
08/26/2021 | ||
Mountain Avenue Overlay 9/2/21 2pm
The City of Ashland is seeking a professional engineering consultant to provide plans, specific... |
09/02/2021 | ||
Negus Transfer Station PEMB 8/24/21 3pm
The County is seeking procurement of a Pre-Engineered Metal Building (PEMB) package through a Man... |
08/24/2021 | ||
KCC Apprenticeship Center 9/9/21 2pm
Work on this contract includes new building and site improvements for a new KCC Apprenticeship Ce... |
08/04/2021 | 09/09/2021 | |
Senior Center Solar Panel Project 8/18/21 2pm
The City is requesting bids for the turn-key installation of an approximately 60 kW, grid-tied ph... |
08/05/2021 | 08/18/2021 | |
Touchstone Interventional Pain Center 8/19/21 12pm
Work of this Project is described as new two story medical office building with office-based phys... |
08/19/2021 | ||
Kepel Spring Protection Phase II 8/17/21 3pm
Work of the Project includes rehabilitation of piping for an existing concrete intake structure w... |
08/17/2021 | ||
Title | Site Walk Through | Deadline |