| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
KCC Fire Tower Training Structure 1/11/22 2pm
Design a Fire Tower training system that will work with drawings and specification for the projec... |
01/11/2022 | ||
|
McCornack ES Asbestos Flooring 1/13/22 2pm
Removal of non-asbestos containing floor tile, and asbestos containing floor tile mastic and cove... |
12/30/2021 | 01/13/2022 | |
|
Sheldon HS Asbestos Flooring 1/13/22 2pm
Work is described as the removal of asbestos containing floor tile, floor tile mastic and cove ba... |
12/30/2021 | 01/13/2022 | |
|
Group 1 Pump Station 2/1/22 2pm
Demolition and reconstruction of two irrigation pump stations. • The existing Barnes Butte Pump... |
01/06/2022 | 02/01/2022 | |
|
Camas Ridge ES Asbestos Abatement 1/13/22 2pm
Removal and disposal of asbestos containing wall and flooring material at Camas Ridge Elementary ... |
12/30/2021 | 01/13/2022 | |
|
Siskiyou Crossroads 1/21/22 2pm
This project is being developed by RCHDC (Rural Community Housing Development Corporation). The p... |
01/21/2022 | ||
|
Generator Install Yreka Clinic 12/31/21 5pm
Install of a 300kW emergency generator to supply power for the Karuk Medical/Dental clinic locate... |
12/31/2021 | ||
|
Harbor Freight Tools TI 1/7/22
Exterior and interior alterations of a former JC Penny Department Store. Interior alterations i... |
01/07/2022 | ||
|
Flanigan Pole Replacements 1/27/22 2pm
Work tasks on this project generally include the replacement of 10 existing wood pole 115 kV H-fr... |
01/11/2022 | 01/27/2022 | |
|
Settling Basin Phase 1 1/20/22 2pm
This project consists, in general, of: Removal and disposal of lead base painted mechanical equip... |
01/04/2022 | 01/20/2022 | |
| Title | Site Walk Through | Deadline |