Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Coburg Rd. Ferry St. RR Bridge to Willamette 1/25/22 2pm
The scope of work for this contract includes: 1. Install and remove temporary traffic control and... |
01/25/2022 | ||
|
JCFD #5 Seismic Rehab CM/GC **Withdrawn**
Project includes structural upgrades bring the facility up to an essential facility. It also incl... |
01/05/2022 | 01/27/2022 | |
|
New Water Meters 2/1/22 3pm
700 New Residential Water Meters |
02/01/2022 | ||
|
The Dalles California HWY Culverts Project 1-13-22 9am
Construct repairs on existing culverts along US97 by rehabilitating or replacing pipes. |
01/13/2022 | ||
|
KCC Photovoltaic Services 1/11/21 3pm
Klamath Community College is requesting proposals from qualified firms to provide Photovoltaic se... |
01/11/2022 | ||
|
KCC Fire Tower Training Structure 1/11/22 2pm
Design a Fire Tower training system that will work with drawings and specification for the projec... |
01/11/2022 | ||
|
McCornack ES Asbestos Flooring 1/13/22 2pm
Removal of non-asbestos containing floor tile, and asbestos containing floor tile mastic and cove... |
12/30/2021 | 01/13/2022 | |
|
Sheldon HS Asbestos Flooring 1/13/22 2pm
Work is described as the removal of asbestos containing floor tile, floor tile mastic and cove ba... |
12/30/2021 | 01/13/2022 | |
|
Group 1 Pump Station 2/1/22 2pm
Demolition and reconstruction of two irrigation pump stations. • The existing Barnes Butte Pump... |
01/06/2022 | 02/01/2022 | |
|
Camas Ridge ES Asbestos Abatement 1/13/22 2pm
Removal and disposal of asbestos containing wall and flooring material at Camas Ridge Elementary ... |
12/30/2021 | 01/13/2022 | |
| Title | Site Walk Through | Deadline |