Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
LCAC Jail North Stair Addition 4/12/22 2pm
The addition consists of a secure, exterior stair of steel frame construction with steel frame ro... |
03/29/2022 | 04/12/2022 | |
|
US26 Fairview & Idlewood ADA Ramps 3/29/22 2pm
Work includes removal of existing concrete sidewalk, sidewalk ramps, curbs, asphalt and construct... |
03/29/2022 | ||
|
Aquatic Weed Control 4/19/22 2:30pm
Control of aquatic invasive weeds on an as needed basis in a manner consistent with the City of E... |
03/30/2022 | 04/19/2022 | |
|
Fulton Shop Building Reroof 4/12/22 2pm
Removal of approximately 30,000 square feet of asphalt composition roofing and the installation o... |
03/23/2022 | 04/12/2022 | |
|
Sewer Interceptor Improvements 4/19/22 2pm
The Project consists of constructing ±6,350 feet of 24-inch sewer main, ±725 feet of 18-inch se... |
03/22/2022 | 04/19/2022 | |
|
Medford GA Apron Expansion 3/31/22 2pm
Project work consists of, but is not limited to, the following: grading, bituminous pavement cons... |
03/17/2022 | 03/31/2022 | |
|
Burney Water Meter Replacement 4/15/22 10am
The Project consists of installation of approximately 380 |
04/15/2022 | ||
|
Overlay Various Streets City of Medford 3/15/22 2pm
Work to be done consists of asphalt repairs, cold plane removal of pavement overlay of various st... |
03/15/2022 | ||
|
Bechelli Ln Loma Vista Traffic 4/14/22 3pm
This project includes the installation of a traffic signal at the intersection of Loma Vista Aven... |
04/14/2022 | ||
|
Flooring Supply & Install Services 3/30/22 2:30pm
The City of Eugene is seeking sealed Bids for Flooring supply and installations services. In gene... |
03/30/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.