Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Medford SD Gym Seismic Retrofit 9/22/21 2pm
Work includes but not limited to: Demolition, Concrete, Masonry, Structural Steel Framing, Steel ... |
09/08/2021 | 09/22/2021 | |
Duff WTP Ozone Equipment 9/21/21 2pm
Removal of existing Ozone System Equipment and installation of the new Owner provided Ozone Syste... |
09/21/2021 | ||
Southern Oregon Seismic Bridge Retro Ph 2 9/16/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
09/16/2021 | ||
US20 Ward/Hamby Intersection 9/16/21 9am
1. Construct earthwork and drainage for a new roundabout. |
09/16/2021 | ||
Pond 1 Sludge Removal 9/7/21 2pm
Stockpile, load and haul approximately 17,400 cubic yards (or 16,000 tons) of biosolids from the ... |
09/07/2021 | ||
Replace AC Surfacing 2021 9/7/21 3pm
Street surface preparation, approximately 126,600 cubic feet of replace AC surfacing, traffic con... |
09/07/2021 | ||
Sidewalk Access Ramp Improvements 9/7/21 2:30pm
This project includes both replacing existing, and constructing new sidewalk access ramps at mult... |
09/07/2021 | ||
Wayfinding Signs OIT 9/23/21 1pm
Fabricate and install seven (7) map/kiosk/directories wayfinding signs at the Oregon Tech Klamath... |
09/23/2021 | ||
Highway 99 Street Improvement 9/21/21 2pm
This project consists of paving, striping, sidewalk, ADA ramp, crosswalk, storm drainage, minor u... |
09/21/2021 | ||
SCADA Architecture Master Plan 9/30/21 3pm
Medford Water Commission (MWC) is seeking proposals from a qualified professional firm to provide... |
09/30/2021 | ||
Title | Site Walk Through | Deadline |