Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Upper West Branch Bridge 4/26/22 1pm
The purpose of this project is to fully replace the Upper West Branch Creek Bridge on Forest Rout... |
04/26/2022 | ||
|
Territorial Hwy Improve Kruger to Fir 4/28/22 3pm
Designing and preparing construction drawings and specifications |
04/28/2022 | ||
|
Silva Theatre Sound System 5/3/22 2:30pm
Provision of a sound system for the Silva Theater at the Hult Center for the Performing Arts. The... |
05/03/2022 | ||
|
Klamath Falls Sonic Project 4/14/22 4pm
Trades involved include but are not limited to; Site/Civil, Landscaping, Underground Utilities, S... |
04/14/2022 | ||
|
East Science MV Electrical Loop 4/12/22 3pm
Purchase and installation of three (3) pad mount medium voltage dielectric switches, provide MV c... |
03/29/2022 | 04/12/2022 | |
|
OR542 Curb Ramps Project 4/14/22 9am
1. Install temporary traffic control devices and pedestrian routing. |
04/14/2022 | ||
|
Margaret Keating ES Reroof 4/27/22 1pm
Removal of existing built-up asphalt roofing, gutters & downspouts. |
04/13/2022 | 04/27/2022 | |
|
Holly Theatre 4/29/22 2pm
Renovations & Restoration of Historic Theatre. Trades include but not limited to: demolition,... |
04/29/2022 | ||
|
Harrison Ave. Pavement Maintenance 4/12/22 2pm
Work to be performed includes, but not limited to, grinding and paving, construction and replacem... |
04/12/2022 | ||
|
SOU Beach Volleyball Courts 4/21/22 3pm
The work scope includes, but is not limited to: |
04/11/2022 | 04/21/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.