Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
North Canal Sewer Main 2/9/22 2pm
Replacement of asbestos concrete sewer mainline on North Canal Blvd between Maple and Larch Avenu... |
02/09/2022 | ||
|
N Pine St. Sidewalk & Path Improve 2/15/22 2pm
Construction of 8-foot wide concrete sidewalk & 8-foot asphalt paths including ADA improvemen... |
01/20/2022 | 02/15/2022 | |
|
Roof Maintenance Services 2/8/22 3pm
The City of Redding wishes to establish a contract with a qualified contractor to furnish on-call... |
02/08/2022 | ||
|
2022 Street Preservation 2/16/22 2pm
26 lane miles of asphalt concrete pavement restoration work. The pavement restoration treatments ... |
01/26/2022 | 02/16/2022 | |
|
Removal of Black Locust Trees 1/25/22 2pm
Removal of Black L... |
01/25/2022 | ||
|
Landscape Maintenance Svcs. 1/21/22 3pm
The City of Sutherlin is seeking a qualified licensed and bonded professional |
01/21/2022 | ||
|
Design/Build Muni Pool Replace 2/2/22 2pm
A design-build contract intended to replace the existing pool recirculation, filtering and pool h... |
02/02/2022 | ||
|
Roof & Building Envelope Consulting 2/17/22 2pm
The Owner is seeking to select a firm to act as the sole contractor to perform roof & |
02/17/2022 | ||
|
Pierce Park 2/9/22 2pm
The work consists of earth work, erosion control, installation of a new children’s |
01/21/2022 | 02/09/2022 | |
|
ACE Charter School MEP System 2/2/22 2pm
Proposers will provide complete preconstruction and design services in coordination with the Owne... |
01/19/2022 | 02/02/2022 | |
| Title | Site Walk Through | Deadline |