Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Ponderosa ES Drainage Improvements 2/3/22 2pm
Installation of drainage improvements including, but not limited to three (3) drywells and sedime... |
02/03/2022 | ||
|
Supply & Deliver Asphalt Oil for Chip Seal 2/2/22 2pm
The Work will consist of, but not be limited to, furnishing and delivery of asphalt materials as ... |
02/02/2022 | ||
|
Winchester Bay Commercial Bldg. 2/22/22 2pm
The Project consists of the construction of an approximately 4000 square foot building, along wit... |
02/22/2022 | ||
|
Board of Supervisors AV System Upgrade 2/3/22 3pm
The system will include voice lift, video presentation and USB |
02/03/2022 | ||
|
City Hall EV Charging Station 2/24/22 2pm
• Install new panel and necessary equipment |
02/24/2022 | ||
|
Washington St. PS Pump Upgrade 2/17/22 2pm
The Project is composed of replacement of four (4) large sewer pumps, replacement of two (2) smal... |
01/25/2022 | 02/17/2022 | |
|
Highland – Glacier Sewer Repair 2/9/22 2pm
Repair sewer main displacements in 3 locations on Highland and 2 locations on Glacier. |
02/09/2022 | ||
|
North Canal Sewer Main 2/9/22 2pm
Replacement of asbestos concrete sewer mainline on North Canal Blvd between Maple and Larch Avenu... |
02/09/2022 | ||
|
N Pine St. Sidewalk & Path Improve 2/15/22 2pm
Construction of 8-foot wide concrete sidewalk & 8-foot asphalt paths including ADA improvemen... |
01/20/2022 | 02/15/2022 | |
|
Roof Maintenance Services 2/8/22 3pm
The City of Redding wishes to establish a contract with a qualified contractor to furnish on-call... |
02/08/2022 | ||
| Title | Site Walk Through | Deadline |